Monday, 24 October 2022

To Tom Bissell of MMA

TEXT to Tom B:  My official and stamped MMA stylus-biro soon fell apart. Could you please send me a replacement? THANKS!  28 Hunnington Cres  HALESOWEN  B63 3DJ   (The biro section fell out, literally)

It was really good to speak to all three of you yesterday on my way to Scotland for more summits - otherwise I would have been on the bike (food fueled, only)!

Since you are liaising between the public and MMA/TfWM/WMCA, I was anxious to meet with you so that you could get something of a different perspective on Metro.  The only one, as you told me - out of a million who all want more Metro. 

The trams are wonderful and I take every opportunity to travel on them instead of the bus. However, your predecessors did destroy our first network in the 1950s, then about one third of the railway network in the 60s onwards and, in the 80s your colleagues set to work to busily rebuild the tram network but, on the closed railway network not yet completely turned into roads or buildings.  And this is what you are doing with WBHE, of course, a railway "of national strategic significance"!!

I would like both of you and Gil/Jill (was it?) to simply take on board the knowledge of this old man who, since 1968, has lived, studied and worked and now retired in the Black Country and Brum.

Using existing transport infrastructure, rather than wasting or destroying it is basic climate change prevention or mitigation and, of course, environmental gain/improvement.

Would you concede or, allow me one tiny satisfaction in knowing that, at least, my guerrilla gardening exploits at Merry Hill since the 1990s are safe?  See my email, below.

The Metro tram rejoins the former principal mainline railway at the Cinder Bank roundabout on the Dudley Southern Bypass.  Where the trams come off the railway after Canal Street tram stop, Hart's Hill, I am suggesting it still goes into the Waterfront and almost all the way to Merry Hill Shopping Centre but, it should terminate at a new Level Street tram stop.  This slightly shortened route is to
  1. save £100 m by not needing to build the 400 metre, steel and concrete, double track, standard gauge, tram viaduct on the 400 m long and high canal embankment, plus a second canal bridge;
  2. save my 'magnificent' guerrilla garden from being wiped out;
  3. save the only public open space at Merry Hill;
  4. everything (and more) in this photo between the road and the canal gets bulldozed for the massive viaduct;
  5. save nature - of which we are part and depend on for our very existence;
  6. save the view of five lovely hills from the canal towpath and from the boats on the high canal embankment; and 
  7. save all the 10,000 sq metres of land designated for housing - after some decades, is still available for very low cost energy apartments for the poor and, "the stranger in our midst", as here:
Level Street tram stop would enable passengers to walk to the Waterfront and, in the other direction, to the shopping centre.  Level St is marked on the above plan and crosses, west to east, the roundabout in the top right hand corner of the plan, above.

Other maps and full details are found here:




What do you think?  Any chance?

Best wishes
 
Tim

Wednesday, 23 December 2020

Tweets to MMA

UK Tram Ltd called trams "buses on rails" at the time of the Croydon tram crash in Nov 2016. "Of a total 69 passengers, there were seven fatalities and 62 injured, 19 of whom sustained serious injuries." Please put electric buses straight on the road without bothering with rails! 27 Dec 2020

BRILLIANT! Well done. However, you are spending finite resources and adding to greenhouse gases on replacing perfectly good and acceptable buses and trains that desperately need investment - with trams! This is seriously irresponsible. Espec at £81 m/Km for Eastside extension.

12.2.21:- Jordan, everyone one of us loves the slick, swish, smart trams. But, thousands of us are now inconvenienced forever because, with priority for trams over buses, we have a longer and slower journey into the city centre by bus or by bus/tram. The Five Ways underpass means no buses.

Tuesday, 21 April 2020

FoI request re Merry Hill Shopping Centre

  1. Could you please send me all reports and minutes of meetings, going back to the 1980s, that concern all discussions over the Richardsons' monorail, the Metro tram and the nearby, Brierley Hill, 120 Kms intercity Worcester, Black Country, Derby railway.
  2. Did PTA/Centro ever suggest or discuss the monorail being extended to the intercity railway to await its reopening asap?
  3. On what date did it take its first fare-paying passenger?
  4. On what date the monorail close?
  5. Why was the monorail closed in the 1990s?
  6. What was the date of its last fare-paying passengers?
  7. Did PTA/Centro ever discuss the possibility of reinstating the passenger railway at the Waterfront/Round Oak?
  8. What were the reasons for always rejecting the railway being completed and new stations built?
  9. Since the formation of MMA/TfWM/WMCA has there been any review or discussion to finish the double-track Worcester to Derby railway to serve Merry Hill, Brierley Hill and the rest of the Black Country?
  10. Can I please have sight of those discussions and minutes?
  11. Why, in nearly forty years, has Metro trams always been the chosen option for the UK's last, virtually ready built, fully available but the forgot the trains and some stations, principal mainline 120 Kms railway?
  12. Unlike other councils in the UK, eg Edinburgh in 2019, why has there never been a debate and vote in a single West Midlands council chamber over the wisdom of proceeding with a rebuilt tram network on the railway network instead of using railway trains?
  13. Is this oversight a matter of failing to follow correct procedures?
  14. Please comment and rebut my own comments above each of the three photos, below.
MY PHOTOS: what you see described by one person as 'bizarre'; another called it 'bonkers':
Wasted 56 Kms from Stourbridge Jct to Burton on Trent on the ready built, but only half used, 120 Kms Worcester to Derby principal mainline railway.
Since the 1980s, the intention remains to fell these trees for an embankment/viaduct for the Metro tram when, 600m away, is the half-finished, half-used principal mainline railway that needs finishing and not wasted, unused and even destroyed in places:
When the 6 lane motorway opened in Dec 2003 with private money, it was half the estimated price per Km of the WBHE (Dudley) tram construction
16 years have passed for metal thieves to pinch the up line.  It is taking an eternity and more to get the trains back because of Metro.