Showing posts with label multi-modal. Show all posts
Showing posts with label multi-modal. Show all posts

Friday, 2 June 2023

Andy Street's Metro review was never published or made the slightest difference!

Dear gentlemen - much ammunition here for you to make mincemeat of the hopeless Tories!

I believe Andy Street ordered the Metro review in 2020.  It could not have been independent because it was to be conducted and written up by Mark Smith, Chair of Audit, Risk & Assurance Committee of the WMCA, I understand.  Therefore, totally biased and useless from the start!

Was this review ever carried out?
Why have I never been able to get to the bottom of this mystery?
What was going wrong with Metro that prompted the review announcement?
Was one reason, the financially irresponsible and enormous cost of a project whose sole reason for its existence was Andy's much vaunted "multi-modal transport" that he wrote to me about?  

Like for like comparison of construction costs:
In 2003, when opened, the M6 Toll was £21m/Km
In 2015 when opened, rebuilding the Borders Railway was £7m/Km
In 2022, Metro Westside extension was £80m/Km, I believe (Andy's one and only feather in his cap!)
“The 1,350m Birmingham to Edgbaston extension cost £149m, including phase one from Grand Central to the library.” = £110 m/Km, up from £75 m/Km at the start. (Peter Madeley in the Express & Star)


What went wrong with the three transport projects that meant that they had to be suspended last year?
A 700 metre section of Metro is taking very many years to build because of stop-start work from mistakes having to be corrected. This suggests serious incompetence at TfWM/WMCA.  Did work on the ground start in 2015?  Surely not!

SCANDAL:
The first idiocy and incompetence was turning a former mainline railway that was unused, into a tramway.  It opened in 1999.
Folly no 2: it was never connected to even the nearby Wolverhampton bus station, let alone the railway station.  As, of course, the railway trains between Wolverhampton and Snow Hill did for 100 years.
Scandal no 3: Commuter and regional trains could have been re-introduced at, literally, a small fraction of the cost that Metro is turning out to be to, eventually, get it to Wolverhampton's last railway station.  And, even then, it permanently bypasses the other station, Snow Hill.  Yet, the go ahead was given by HMG (actually, Norman Baker MP, Transport Minister) to connect Snow Hill to Grand Central that has never come about and never will.  That really was its sole justification.  The epitomy of incompetence!

Why was a new University Station given the go ahead when there were far more urgent transport projects, like re-opening or, simply finishing with freight and passenger trains, the 120 Kms (74 miles) Black Country Railway between Worcester and Derby?

In Andy Street's six years, not one railway project has come to fruition because he gave Metro expansion top priority.  Yet, he has only achieved the completion of one tram project in six years (that started way before him, anyway!).  That one scheme is Westside Extension that was shortened to end at 54 Hagley Road instead of seeing the demolition of the fine Calthorpe House on Hagley Road (the original plan).  Metro is a grossly extravagant, prestigious, wealth-flaunting project to impress the tourists and to entice businesses to a city that is wanting to rival the Paris, Milans and Tokyos of this world.

Remember, WMCA transport I believe, takes the biggest slice of the finance pie.  Insulating and solar powering the Midlands buildings should have that slice in the light of your self declared climate emergency that is bringing us all a bleak future.

Please ACT.  And a decent reply would make my day!

Friday, 18 November 2022

QUESTIONS

How is multi-modal transport of vast expenditure, consistent with spending on urgent projects only that will, in the medium to long term, cut GHG emissions to bring green growth?

Tuesday, 19 July 2022

METRO - the answer to all our prayers!

  1.  Is multi-modal public transport, as we now have and with many more extensions planned, able to tackle the climate emergency better than having only bus and train?
  2. If so, in what way and where is the independent research that brings the cast iron evidence that 'the more Metro the merrier'?
  3. Is there proof that the three main modes of public transport (bus, tram, train) are the silver bullet to end road traffic congestion and pollution?
  4. Does the second most expensive mode to construct after HS2, even so, lessens congestion and air pollution on our streets more effectively and with better value for money than electric buses directly on roads without the railway tracks having to be laid first, as is the case for trams?
  5. Is there evidence that in the Walsall, Brum, Solihull corridor with three different kinds of buses and heavy rail, that a higher proportion of car commuters have permanently switched to trains and the three different kinds of buses?
  6. Is there proof that spending the most money possible on grandiose transport projects like Metro and HS2 really do cut greenhouse gases in the short, medium and long term?
  7. Can one safely say that more spending = more greenhouse gas emissions = fewer finite fossil fuels left in the ground = an uncomfortable future for our descendants?

Saturday, 20 February 2021

Multi-mixed-up public transport

Trams in the W Mids are taking over some bus and train routes to give us multi-mixed-up (whoops, sorry) multi-modal transport at 10x the cost per Km of rebuilding a railway in southern Scotland in 2015! Result: a slower, longer, worse public transport journey - PROGRESS!!!

Thursday, 14 January 2021

Modern and multi-modal - Facebook and Twitter

Tramways must be built because it is "a modern form of public transport" (Cllr Qadar Zada) and is "multi-modal transport", says Mayor Andy Street.

Modern because in the modern age, trams are taking over from buses and trains at the most colossal expense.  Multi-modal means that an additional delay is caused by having to change from bus or train onto the tram.  More waiting and a slower journey.  Therefore, it puts people off from using public transport.

Far better to use the £15 billion to 2040 for extending FFPT from the elderly to everyone and, to give us electric buses directly onto the road without the rails having to be laid first.  Give us bus priority roads.

Space for the "bus on rails" trams at the bus station means more congestion for the buses that go directly on the roads without having all the fuss and expense of digging up the roads for the "bus on rails" tram. Replace diesel buses with electric buses!

YOU SAY:  The Wednesbury to Brierley Hill Metro extension will boost public transport in the Black Country, providing much-needed links to the existing heavy and light rail networks.

I SAY: Use the half a billion to boost existing public transport with such a large percentage drop of people using it.  Boost it by extending Fare-Free Public Transport to everybody.  As a reward for doing the right thing in leaving the car at home and as compensation for the slightly higher risk of getting Covid.

I know wht you mean 
Tim
 but surely, irrespective of the noise (which I presume is what you are referring to) a freight train is no bad thing, whichever way it goes, when you consider how many lorry journeys are taken off the roads by one freight train?

With commuter trains finally going back on the Kings Norton, Kings Heath, Moseley line, freight on that line may be needed on the 120 Kms railway. Nothing to do with noise, Dave! Perhaps, freight can go on at night with trams during the day? But still a misuse and underuse of an important mainline railway. The test track is another complication for rail freight operators but they have never done anything to stop the trams!

Carl M Cox 17 tram stops over 11 Kms makes for a compulsory tram stop every 650 m. How does that compare with buses that only stop when requested? On Metro One tramway, the average speed is 20 mph when I've been on it. 13 miles in 40 mins = 20 mph. Certainly quicker than the bus but, why did you all lose about 100 Kms of railway lines to homes, shops, offices, roads and trams since the 1970s? Just put the trains back before anymore railway lines are destroyed - as you are doing, in fact!

Thanks for this, Carl. But why not save all those deadly greenhouse gases and have electric buses with pneumatic tyres directly on roads? Phase-out diesel buses. Use the money saved to put freight/commuter trains back on all 120 Kms and there would still be money left to extend Fare-Free Public Transport (FFPT) to your age group, too! I've had it for 13 years I'm so ancient. And FFPT is done in about 100 towns and cities around the world, according to Bob Whitehead who has researched it.

Jackie, Dudley Leisure Centre is the second newest leisure centre in Dudley borough. It is a shocking waste of finite fossil fuels and spews out yet more deadly greenhouse gases to move it all of a 1 Km walk to Flood St tram stop. I am worried about future of you young people! 15.1.21