Wednesday, 22 March 2023

to Ian Ward re OWW Railway Co and Parkhead

Very many thanks, Ian for letting me know.  You are very decent and highly capable and respected.

£60 m is nowhere near enough, I would have thought.  A pittance, especially when Phase 2 is the most costly and difficult half to achieve, I've always thought.

£60 m must be used for one of my three options to be delivered, please.  Preferably option One and the £60 m returned to HMG!  Or, you ask for it to be used for the world's first train-tram-train mainline railway between Great British Railways HQ at Derby, Walsall, Dudley, Stourbridge and on to Worcester, Bristol/Oxford ... London.

WBHE Phase 2 is still irresponsibly expensive and disastrous when it destroys the only public open space at Merry Hill with the 400 m viaduct and two oblique canal bridges, the desperately needed housing land at High Plateau, nature in one of the most nature depleted countries in the world (Attenborough) and, my magnificent vertical guerrilla garden I would love to show you, Ian.  Five councillors have had the decency to visit, with me - including your Opposition leader.  Don't miss a treat!!

It is scandalous that the Parkhead Viaduct work is being paid for out of the WBHE money for, officially, now £550 m (2020?), I understand.  Network Rail should have done the work in order to reinstate the commuter, regional and freight trains between Gt British Railway HQ in Derby and Worcester.

In 2013 or 2014, I can remember Toby Rackcliff, at 16 Summer Lane, telling me that Parkhead strengthening would be £10 m, he thought.  I believe, it is still nowhere near finished.  I shudder to think what the cost is, so far.  Network Rail palmed it off onto yourselves and you should never have allowed it, accepted it and, certainly not for trams.  You were sold, or given, a pup, I'm sad to conclude.

For about 100 years, Dudley Station (not tram stop!) Parkhead Viaduct and Stambermill Viaduct were all used very successfully for passenger and freight trains by the Oxford, Worcester, Wolverhampton Railway Company.  It is quite scandalous the destruction of seven Dudley railway lines and about 100 Kms in our region, I would guess.  100 Kms are still available for the reinstatement of trains.  But they must have top priority NOT trams, please my friend.

Very best wishes.  You are a busy man, I know.

Tim

On Wed, 22 Mar 2023 at 19:11, Councillor Ian Ward <Ian.Ward@birmingham.gov.uk> wrote:

Tim

 

The recent Devo deal has provided money or the promise of money for the Brierley Hill Metro extension.

 

Ian

 

From: Tim Weller <timweller1@gmail.com>
Sent: 22 March 2023 17:31
To: <Customer Services> <customerservices@tfwm.org.uk>; Councillor Ian Ward <Ian.Ward@birmingham.gov.uk>
Subject: 3 option suggestions to save money and greenhouse gas emissions

 

The Dudley Tram is so very expensive that WMCA transport lead, Cllr Ian Ward, has personally told me that there is still no money for the section from Dudley Transport Interchange to Cottage Street, Brierley Hill.  Therefore, the authorities can save £100 m by either:

  1. Leave the tram to terminate in Dudley town centre when it opens next year.
  2. Take the tram on down Flood Street to Cinder Bank roundabout where it is planned to rejoin the former mainline railway and, then keep it on the double tracks to Stourbridge Jct to connect with the national railway network.  Freight trains will have to operate at night - no great hardship.
  3. Keep to the original plan but let it cross the Dudley No 1 Canal once only and, then, terminate it between the shopping centre and the Waterfront - at Level Street, halfway between them.  This saves about £100m from not having to build the 400 metre concrete and steel, double track viaduct and the second canal crossing.

Tim

Monday, 27 August 2018

SUNDAY'S BIKE EVENT WAS NO WASH OUT!

SUNDAY'S BIKE RIDE EVENT WAS NO WASH OUT  Or, this will turn you green with envy (I don't think)!

When I was expecting no-one, my faithful friend, Roy of Stourbridge turned up on his bike and it was a wonderful couple of hours.

We found a short section of canal water at Parkhead Locks where we never saw our own reflection but did see through the amazingly clean water to the bottom.  This was at the entrance to the Dudley tunnel with 1884 in white lettering on the brick work of the portal above.

We then explored a short section of our wasted railway "of national strategic significance" (Network Rail and DfT on the 8 March) that has been completely cleared in readiness for the non-appearing local trams in, so far, 37 years of trying and being very trying.  Roy and I have other ideas.  We want the return of the regional and national trains that were so successful for 100 years until we started to put all our eggs in the one basket of road transport for everything and everyone.

Trains over the full 120 Kms between Worcester and Derby can take vehicles off the jam packed roads and motorways that run alongside the empty, double tracks of our forgotten main line railway.  This is a much better idea than the planned 11 Kms of tramline to destroy the railway.  Or, the proposed 87 Kms, eight to ten lane Western Orbital Motorway, nearby.  From my research, the UK's new tramlines are working out at about double the cost per Km of new motorways.  And the trams simply replace diesel buses and local trains that could all be electric, if public opinion forced the authorities to do it!

Parkhead Locks and railway viaduct is a huge area of open space that many never visit.  We did, though!  We found a 70 foot, beautifully decorated narrow boat going through one of the deepest locks in the land.  We helped it through.  It was called 'Miriam' and it was halfway on a two week long circuit from Sharpness on the river Severn between Gloucester and Bristol.  I now know what a cratch is and where to find the two cleverly plaited rings on a narrow boat.

On the, now hard, puddle free, and mud free surface of the towpath to the colourful Waterfront marina, we saw the proposed site of the tram stop - NOT railway station, mind you but, the so small ambition tram stop of all things.  And this on a partly unused, main line railway "of national strategic significance"!

For me, the grand climax of the short cycle ride was my magnificent guerilla gardening landscape enhancement scheme to cover the rusting, 20 metre high blot on the landscape of metal sheet piling that holds up a huge area of wasted, flat land bereft of its first time homeowners and renters to enjoy the shops on one side and the canal on the other side.  Roy liked the variety of plants there, including the blackberries coming down from above.

We finished the ride and parted at Saltwells Local Nature Reserve on the other side of Merry Hill from the canal.  This is an area of woodland and an SSSI - a Site of Special Scientific Interest - for Doulton's clay pit that is there.  It's a geological SSSI.

I'll organise it again in twelve months time to get you all out and about on your human powered transport!