Showing posts with label capacity. Show all posts
Showing posts with label capacity. Show all posts

Tuesday, 14 September 2021

The LIE that it increases capacity.

Chris Packham could not have spoken a truer word. It makes all our problems worse, intensifies the climate emergency and shouts the lie that it will reduce overcrowding, increasing capacity when it rockets past every intercity station, duplicating plane travel. That is the lie.

https://www.facebook.com/ChrisGPackham/videos/4075923782529709/

It cannot help in lessening the destruction of nature when it is such a heavy-footed and greenhouse gases intensive way of making all our problems worse and speeding us to THE END. HIGH SPEED TO FOUR TERMINUSES.  Humans are on track to terminate themselves faster!!

Monday, 13 September 2021

How the official lie is put

"Building HS2 frees up a massive amount of space on the existing railway by placing long distance services on their own pair of tracks. Once HS2 is operating, services can run much closer together, meaning there can be more rush hour trains, helping to relieve overcrowding.

"Once the full network is operational we expect HS2 trains to carry over 300,000 passengers a day."

from   https://www.hs2.org.uk/why/capacity/

What do you do about the many intercity stations, HS2 is too fast to stop at?

Have you thought of that?

Saturday, 11 September 2021

THE MOST EXPENSIVE LIE, EVER!

THE MOST EXPENSIVE LIE, EVER!

The railway industry has fully co-operated with the destruction of between one-third and one-half of the total railway lines that there were built in the UK.

Our politicians and transport experts were fully in support of the closure of Wolverhampton's second principal mainline railway station and for turning most of the double-track railway line into a slow, shuttle tramline, linked to another principal mainline railway station that was demolished and then rebuilt to half of its former size, with only four platforms left (Snow Hill).

For 50 years, one of only two principal, mainline railways between Brum and the Welsh coast has been left wasted and unused between Burton on Trent and Stourbridge, despite many tens of millions of pounds having been spent on tunnels and bridges for the mainline railway to cross every motorway, road and canal.

Since 1981, the politicians and transport experts have given their top priority to putting trams back on railway lines instead of commuter and regional passenger trains and freight.  And, with breaking up the once integrated bus network into a disintegrated bus and tram network for more changes, delays and a slower public transport journey.  A CASE IN POINT:- Five Ways underpass and Broad Street closed for every bus, forever!!

Their top priority now is to extend the tram network to the HS2 line (and, well-provided for Solihull) even though they are all fully aware that the trams are replacing buses and, that this work is extremely expensive at between ten and fifteen times the cost per Km of rebuilding the Borders Railway through only half of the Southern Uplands of Scotland in 2015 and that never reconnected with Carlisle from Edinburgh.

One new electric bus is £350,000 but one new tram is costing £4 million!

HS2 is costing at least £106 BILLION to allow passengers to travel between only four cities and two airports.  There may be two stops for some HS2 trains at Crewe and Toton.  YET, every intercity train must continue to run to maintain the existing service for the many towns and cities that HS2 is too fast to stop at.  What a waste!  What ecocide in escalating greenhouse gases to turn earth into venus!  (see Wikipedia for the runaway greenhouse effect on uninhabitable venus)

It is a LIE to say that HS2 is needed so that "capacity (is) freed up on the rail network"


Best wishes    Tim