Rather than jobs at any price, do you agree that the wealthy must ensure through their taxes that everyone must have a basic living income to ensure a comfortable standard of living to guarantee decent shelter, food and clothing?
Wednesday, 20 October 2021
MORE DESTRUCTION OF RAILWAY LINES
Saturday 18 September 2021
Dear James Morris,
This is is absurd, scandalous and immoral spending for "bus on rails" trams, First Class Sprint buses, Second Class Platinum buses all on Hagley Road, with cars, trucks, vans and lorries! The authorities are escalating us to catastrophe with greenhouse gases led ecocide.
Never any consultation or the slightest whisper of even giving a nod towards following the correct democratic procedure for councillors to discuss, debate and vote on all this wasteful, stupid expenditure of taxpayers' money.
Derby to Devon via Dudley principal mainline railway continues to get destroyed with two further nibble sized sections being converted to "bus on rails" tramway! Incompetent idiocy is no exaggeration.
Building HS2, Metro and Sprint are NOT green jobs!
Is it really a green, ecologically sound job to be building a high speed railway line for a small minority of wealthy business people to travel between only four English cities and two of their airports? Especially, when everyone else will still have to stick to the more mundane, ordinary, existing but, perfectly fast enough intercity service?
Is it really a green and an ecologically sound job to work on the second most expensive transport mode after HS2, when it simply results in, again only a small minority of people in Edgbaston within walking distance of the tram stop who do have a more direct and quicker service into the city centre itself? Everyone on the 11 different bus routes either have a longer, slower route if they stay on the bus or, they get off and wait for the tram to take them on to Colmore Row on the edge of the city centre.
Is it really a green and an ecologically sound job to be building a First Class Sprint bus line from Walsall to Solihull? Solihull that already has the basic transport modes of bus and train, plus the highly expensive, climate worsening HS2, Metro and the bus that thinks its a tram, Sprint.
Another bleak warning from the UN
RADIO 4 'TODAY' NEWS REPORT
"A UN report says major economies are planning to produce more than double the amount of fossil fuels than would be consistent with meeting a key climate goal.
"Experts from the UN say the amount of fossil fuels that major economies including the UK are planning to extract this decade are incompatible with keeping global warming to safe levels. It was agreed at the Paris Climate summit in 2015 that the average temperature worldwide should not be allowed to increase by more than 1.5 C. With more on the UNEP report, here is Matt Magrath:
"This report says there is a huge and growing gap between the fossil fuel production plans of major countries and the limits that science says are necessary to keep the global rise in temperatures to safe levels. According to the study, coal, oil and gas producers including the US, the UK, Saudi Arabia, Russia and Australia expect to extract around 110% more fossil fuels by 2030 than would be compatible with the 1.5 Celsius temperature rise. Coal production is likely to drop but gas will increase the most in the coming years. The authors say these plans are simply incompatible with the Paris Climate Agreement.
"This report illustrates how far countries have to move to keep the key goal of 1.5 alive is to be realised."
A NASA climate scientist says it was indicative of a wider failure to go into what he called, 'climate emergency mode'. "There is a comforting sense that if there are a bit more renewables, a bit more electric cars and all will be well. We cannot keep saying it is an emergency or saying that it is an existential crisis and then continue to expand the very things causing the emergency in the first place that is just burning fossil fuels."
Tuesday, 19 October 2021
Three VIPs sound off
"They've been calling for it for quite a while", said Evan Davis this evening on 'PM', Radio 4.
The Gospel of Public Transport According to St Tim the Sinner!
Hi Lee and Cllr Waseem
Monday, 18 October 2021
SO-OO-OO IMPORTANT! The mighty, 22 Kms Black Country Cycle-Walk Mudway!
Dear Judith, Harry and Michael - and copied to my own, much under-appreciated MP, James Morris.
- 22 Kms in length, made up of two unused railway lines with a funny kink in the middle where they don't quite meet!
- Mentioned in our current 'Walk' magazine. Can you find the mention?!
- Connects one city and one town via the delightful village of Wombourne in South Staffordshire.
- Well used in Wolverhampton and South Staffordshire by all kinds of walkers and even some horse riders and cyclists.
- NOT well used in Dudley borough because, in places, it is overgrown and muddy and waterlogged.
- An unrecognised, forgotten, unappreciated, unloved cycle-walkway.
- But all of it could be a business, commuter and leisure route for cycle commuters deserting their cars to respond to the climate emergency. Like I have, literally, for decades!
- Three nature reserves, with two in Dudley borough.
- Two refreshment halts in two old Victorian railway stations.
- One nationally important long-distance footpath, the Monarch's Way, uses part of it.
- One Woodland Trust property, with car park, called Himley Plantation is next to the cycle-walkway.
- One SSSI at Pensnett, Dudley for its nationally famous Great Crested Newts.
- Baggeridge Country Park is nearby.
- Recognised by the Ordnance Survey on their Explorer map as a major "traffic-free cycle route".
- HS2, Metro and Sprint extensions all prove money is in great abundance and grows on the trees that don't get felled for HS2!
I think I was wrong when I said on Saturday ...
... we, the UK, are not engaged in any war at present apart from our provocative/aggressive Royal Navy sailing in the South China Sea and through the sea between China and Taiwan. Hence:
No economic health without ecological health
Sunday, 17 October 2021
Eccentric game changer - changing a mainline railway into a tramway!
Mayor of the West Midlands and chair of the WMCA Andy Street, said:
The Wednesbury to Brierley Hill Metro extension will be a game-changer for the Black Country as it will help to boost public transport whilst providing much-needed links to the existing rail and bus networks.
There are already links to the bus network with large bus stations at Dudley and at Merry Hill on the route of the tramway. And, a forgotten link to the nearby, half-used railway!
The existing bus route is to be duplicated by a tramway that also uses the Derby to Devon via Dudley principal mainline railway that gets destroyed in the process!!
All for half a billion pounds (£500 m) for only 10 Kms!!
Scotland rebuilt a railway of 50 Kms for only £350 m in September 2015.
The foolish authorities even built a link between the nearby mainline railway at the Waterfront and the bus station at Merry Hill. But, they forgot to extend it, only 400 metres further, from the Waterfront car park, to the principal mainline railway between Worcester and Derby - and, to finish the railway with passenger trains, too!
“An elevated monorail was officially opened at the Merry Hill Centre on June 1st 1991, costing £22,000,000 to build."
"The monorail was broken up in 1996 and sold to a shopping centre in Queensland, Australia." (Google search)
Saturday, 16 October 2021
CORBYN GOES TO COP 26 for his own four events
Former Labour leader Jeremy Corbyn is set to come to Scotland to hold an “alternative Cop26”.
Corbyn, through his Peace and Justice Project, will hold four events, three in Glasgow and one in Edinburgh, between November 8 and November 11.
Among the events is a “climate justice cabaret”, bringing together musicians and artists, as well as a panel with trade union leaders and two in conversation-style events.
Code red for humanity
The Islington MP said he would look to “raise up the voices of others” during the tour.
The climate emergency is a ‘code red for humanity’, is a critical warning.
We need radical and rapid change to our dangerously broken and destructive political and economic system.
Our future is being stolen from under us by a coalition of big polluters and big banks, propped up by weak politicians too scared to take them on.
I can’t wait to be in Scotland during Cop26 to add my voice – and more importantly raise up the voices of others – to propose radical and rapid change.”
Linked crises
Corbyn added:
That change must be environmental but also social and economic. Our crises of inequality, climate, Covid-19 and democracy are all linked.
The climate is a class issue at home and an international justice for the world. Those who have done the least harm suffer the most and the first.
That’s why the demands of workers and the global south need to be at the centre of our campaign for climate justice.
Our events will raise their demands through talks and discussions as well as music and art from hugely talented performers.
Thursday, 7 October 2021
My 2nd resolution to Left Unity
Dear friends and comrades
Thursday, 30 September 2021
It's official. It's magic. If it sounds too good to be true ...
HS1 was £54 m/Km when it opened in 2007.
HS2 is, so far, £191 m/Km over its full 555 Kms, at £106 billion.
How HS2 creates more rail capacity
As a brand new railway line, HS2 is the best option for taking the pressure off the existing network. It takes the pressure off the existing intercity lines by flying past all the stations travellers on the intercity trains want to stop at. It adds extra capacity where it is needed most. To benefit London, Birmingham, Manchester and Leeds, ONLY. Building HS2 frees up a massive amount of space on the existing railway by placing long distance services on their own pair of tracks. But you still have to have the same level of service for those same long distance services. Nothing is gained! Once HS2 is operating, services can run much closer together, meaning there can be more rush hour trains, helping to relieve overcrowding. Only if the existing intercity trains are slowed. And that gives the intercity stations a worst service.
Once the full network is operational we expect HS2 trains to carry over 300,000 passengers a day. HS1 to Europe has 6,000 passengers a day. HS2 is future proofed, by making sure the network can grow with increased demand. High Scandal 2 is a scam, a deception and nicely accelerates the runaway greenhouse effect for our ultimate downfall.
ONE HORRIBLE HISTORY OF TRULY, TERRIBLE, TRAGIC TRANSPORT:
17 November 2021
Dear Carol - and copied to my constituency office for them to start putting right my criticism, here.
I was the man in your breakout group yesterday evening who used his self-powered bike for commuting and for social work visits for the last, nearly 20 years of his career in Brum. The car was occasionally used when it was icy or snowy in the mornings.
Five workers (includes the MP) in my constituency office have never shown any interest in any of this scandal, below! All have looked the other way. I would like Unison and the SWP to do very much better, please.
Regional Transport in TfWM's much loved bite-sized chunks!
'WARMING TO CYCLING' in our ever hotter greenhouse!
Dear Keir - my response in blue to yours in black.
This sounds like a really great opportunity, and it’s good to hear that Dudley Council are supportive.
This is such an important and major 22 Kms Black Country Cycle-Walk Mudway that THREE councils are responsible for the state of the route. Dudley's section is worse but all three councils and the West Midlands Combined Authority need to work together to raise their standards and, to get their priorities sorted. This scandal has gone on for quite long enough.
However, unfortunately as an organisation we’re not generally in a position to lobby combined authority leaders on what specific schemes they should invest in – we think this is better left to local campaigners who are connected to the area, and have the expertise to know what investments would be most worthwhile.
There is no interest and no support from local campaigners, apart from David Cox who has told me, earlier this year that he will join me in cycling the route. David told me that the first step is to get an NCR number for the 22 Kms. Not even that has been done by the cycling/walking organisations or by the authorities! Ridhi Kalaria, at Sustrans, knows all about the 22 Kms mudway since she interviewed me when I stood as a declared candidate in the election of the W Mids Combined Authority, earlier this year. But there is no action from her, either!
David and Ridhi are meant to be promoting cycling in the UK to help us all get out of the deadly hot greenhouse we are turning planet earth into. BUT, EVEN A SIMPLE ACT OF NEGLIGENCE, LASTING DECADES, CANNOT BE PUT RIGHT with an all-weather, wide surface on this business, commuter and leisure route alternative to the infernal car!
Adam Tranter is the Cycling Czsar for Coventry. But no reply, interest or support from him, either! He does have the ear of the WMCA but total silence, apathy, nothing. Absolutely no-one is at all bothered! So we all sink in the mud and mire of our own making as the planet goes to pot. And only Greta Thunberg has the guts to say anything. And Insulate Britain and XR, to act.
While the scheme you mention sounds great, Cycling UK couldn’t lobby for investment in this without also identifying all the alternative schemes potentially needing funding, and assessing these against each other, and unfortunately we just don’t have the resources to do that on a local level across the UK.
This 22 Kms existing route is of national importance. It must have your national organisation vigorously promoting it to insist that the WMCA and the three councils finally ACT.
Stourbridge Cycling Club has not replied to even a paper copy to their clubhouse address, appealing for their interest and help for a shockingly poor facility they do know all about. Yet, once again, nothing! Our only national organisation, CYCLING UK, really should be taking an interest in this national disgrace that is the 22 Kms Mudway through three councils and one Combined Authority area in the heart of Britain.
I would suggest the best thing to do, if you haven’t already, is to try to get in touch with David Cox from Bike West Midlands (david.cox.1@cyclinguk.
Sorry that I can’t be of more assistance. But you CAN make all the difference, Keir - along with Duncan Dollimore who rang me a couple of years ago about our major, nationally important mudway. Promote it and CYCLING UK get all the credit, glory and praise for succeeding.
Best wishes
Tim (Weller)
Wednesday, 29 September 2021
Borders Railway v Metro tramways
There are big differences between the Borders Railway and ours:
On the Borders Railway structures: “42 newly constructed and 95 in need of refurbishment”.
Nothing like this is required for the Black Country Main Line. All of these new structures were done for rural, depopulated southern Scotland. This was a huge amount of work but much less work is needed for OUR railway in our urban, densely populated Black Country.
For them, the line was not fully safeguarded, I have been told. Buildings had to be demolished. Ours is safeguarded and no buildings need to be demolished.
£133 m/K for the Eastside Metro extension in 2021; £7 m/K for Borders Railway in 2015. Scotland's train tracks will last but our tram tracks get replaced after 5 years. A scandal, a scam, a disgrace. Yet, no-one bats an eyelid!
Every £1 spent = more greenhouse gases = escalating climate catastrophe = ecocide. And that is not funny.
"VLR is much cheaper."
"VLR is much cheaper."
Yes, indeed. Very much cheaper but we are now having the break up of public transport into:
- Very Heavy Rail (VHR), High Speed train on its dedicated tracks to connect only four cities and two airports - for your 1st class VIP passenger;
- regular Heavy Rail (HR) train for your 2nd class riff-raff passenger (me) on intercity, regional and commuter trains;
- Light Rail (LR) Metro tram;
- Very Light Rail (VLR) tram test track (on the Derby, Dudley, Devon mainline);
- Ultra-Light Rail (ULR) tram (Stourbridge Shuttle. Proposed extension to connect with VLR at Brierley Hill on the Derby, Dudley, Devon railway.).
- 1st class Sprint buses.
- 2nd class Platinum buses.
- Hydrogen fossil fuel buses (so what's the point? Only cleaner air, of course. But, why not stick to electric buses from more and more renewables as they roll out?)
Excitement for all things new and hydrogen and HS2!
Yesterday's David Middleton Sustainability Conference was excellent for its well-chaired meeting, fine speakers and discussion groups.
However, it was notable for green organisations and groups wanting anything electric, anything hydrogen and for one person I spoke to who was strongly in favour of HS2.
Electricity generation comes very largely from finite fossil fuels, as does hydrogen. Nuclear power is another favourite for some. Yet, that may also emit more greenhouse gas emissions in its construction than what it saves when it eventually is up and running and giving electricity. Is that true?
Which renewable gives the least greenhouse gas emissions in its construction?
Monday, 27 September 2021
METRO BLUNDERS GALORE!
THIS IS WANT THE TOP OFFICERS HAVE TOLD ME:
You've got to have Metro through Dudley first, as the catalyst for reopening the Worcester to Burton on Trent railway.
The construction for Metro has passive provision for commuter and regional trains to be added later. Yet, only some railway bridges are being strengthened to carry heavy railway trains at a later date!
THEIR INCOMPETENCE:
Building the Derby to Devon via Dudley railway line and then forgetting to finish it between Stourbridge and Burton on Trent with passenger and freight trains - and the stations, too!
Dudley/Sandwell to Brum buses get pushed out of Five Ways underpass and Broad Street to have a longer and slower diversion on narrow roads with parked cars. The "bus on rails" trams get the underpass and Broad Street, instead!
No money to correct the discrimination against "hard-working families" who don't get the regional Fare-Free Public Transport (FFPT) that old crocks like me have had for 13 years!
But, more money than sense for converting buses and trains to Metro "bus on rails" trams. At 10 x per Km more expensive to construct, than rebuilding the 50 Kms Borders Railway through the hills of southern Scotland.
Engaging with HS2 expert, Shannon (DfT)
Dear Shannon