Showing posts with label heavy rail. Show all posts
Showing posts with label heavy rail. Show all posts

Thursday, 23 July 2015

Letter from Cllr Peter Lowe, Leader of Dudley MBC

21 July 2015

Dear Mr Weller

Re The Rail Crisis and HS2

Further to your letter to the Times of the 29 of June copied to the Council I would make the

following comments.

I am sure you will be aware that the Staffordshire line fell to Dr Beeching’s axe in the early

1960’s as part of swinging cuts to those parts of the railway network which were uneconomic in

this case for passenger heavy rail services.  Although it continued to be used for freight services

the line was finally mothballed in the 1980’s.

The reintroduction of heavy rail services on the Staffordshire line, as you discuss in your letter,

has been investigated a number of times since its closure but has proved to be as uneconomic

as when it was originally closed in the 1960’s.  Unfortunately heavy rail cannot deliver the

frequency and accessibility provided by the latest tram technology and so although apparently

easier to implement struggles to compete in the inter urban context.

The Black Country District Councils, although still strong supporters of the Metro proposals,

recognise the difficulties in bringing them forward.  We have therefore recently commissioned a

new rapid transit study to consider the best way to deliver improvements to passengers’

services and in particular utilising the abandoned rail lines.  I believe you may have provided

input to the study being overseen by Walsall Council on behalf of the Black Country.

With regard to the development of a new lighter and cheaper light rail passenger system known

as Very Light Rail you will also be aware that Dudley Council are working with Warwick

Manufacturing Group to build an innovation centre at Castle Hill.  I can assure you that the

centre which will include a test track on the mothballed line will not affect any of the current

proposals for passenger services or the need to reintroduce freight services at some future date

as demand dictates.  The development of the centre and of the technology it will produce is not

a pre-requisite for its use in the Black Country but I assume if successful could be considered at

some future time.

I hope this clarifies the situation and allays some of your concerns regarding the future

reintroduction of passengers’ services on the old Staffordshire line.

Yours sincerely

Sarah Norman          Peter Lowe

Chief Executive Leader of the Council

Cfi. M.Holloway - Head of Traffic & Transportation

Monday, 19 January 2015

Inter-city and commuter Black Country Rail Line now has another obstacle placed in its path!

​
Dear Mr Ian Austin - and copied to a few of the decision makers and people of influence

The unused, nationally important Black Country Line is the only north-south rail line between New Street Station in the east and the Hereford-Shrewsbury line in the west.

I am attempting to see all the MPs on the Black Country Rail Line to show how advantageous it would be for their constituents.

Thanks very much for your prompt reply that came this morning.  However, you are not on my side at all, as the fine letterhead would have me believe!

In addition, you need to intervene not on my behalf but on behalf of your constituents who might like to have a direct rail connection to all parts of Britain, now.  Do you not feel able to make representations on behalf of the Zoological Gardens, the Castle, Canal Trust and Black Country Museum who might like to be connected, once more, to the national rail network in this decade rather than the next?  And, in this life rather than the dreams of the next!

For about twenty years I have been working, from time to time like you, in trying to get "Dudley town connected to the wider transport network, for businesses to locate here and to bring jobs to the area."  You write, "that the plans are finally making some progress."  They are not, in my opinion.

These are the obstacles:
  1. The plans are still to put light rail Metro trams on a heavy rail double track line.  But, now, the latest plan is to put very light rail tram trains as well as the light rail Metro trams that have failed to turn up even late, in 34 years!  This is absolutely absurd.  The 13 miles is reserved for freight, only and never for poor passengers - and, for only a little matter of 50 years, too!
  2. Only one tram line in 34 years of fruitless endeavour is a truly shocking and laughable record.  'Private Eye' would have a field day, if they knew!
  3. Don't you think that putting existing passenger trains back on the 45 miles of heavy rail lines they were designed for, would be more sensible - economically and ecologically and improve capacity on the rail network in Brum and the Black Country?
  4. At least, the light rail Metro was fully developed, tried and tested before it was put on the Snow Hill to Wolverhampton Low Level rail line.  The ultra light tram train is under development by the Warwick Manufacturing Group.  How many more years will have to creep by before the tram train is sufficiently safe and reliable for the public to use?  For the Parry People Mover, it was getting on for twenty years.  It is now on the Stourbridge Jct to Town branch line - ideal for light rail.
  5. In the meantime, why not put existing diesel trains and stations back on the Black Country Rail Line that would also include inter-city trains from London and Glasgow?  More capacity is urgent - now!
  6. Would you support the Innovation Centre being built at Trindle Road/Castle Hill and using the mothballed line out to Wolverhampton via a new rear entrance to the Black Country Living Museum and directly to Dudley Canal Trust?  Could the Museum and Trust contribute funds?
  7. Alternatively, would you support the Innovation Centre and its ultra light rail, tram train being developed on the flattened Brierley Hill Steel Terminal site at Moor Street (opposite Lindsey Place)?  There is a 2Km line there that could be brought back to test the tram train, instead of the 50 year old, mothballed inter-city line.
  8. Would that not be more sensible than preventing inter-city and commuter trains being returned to 13 miles through the very heart of three Black Country boroughs?
  9. How very strange that passenger numbers and robust business cases all confirm that it is economically viable to have light rail Metro and, now at the same time, an untried, very light rail tram train but, never for run of the mill, inter-city and commuter trains on our unused Black Country Line.  The simple solution is all too obvious!
  10. Are you not intrigued that, including our forgotten inter-city and commuter Black Country Line, there are 45 miles of double track freight only lines in our densely populated and congested urban conurbation of Birmingham and the Black Country?  WHY?  Not just intrigued but pretty livid would be a more appropriate reaction!
  11. ​
    ​To the best of my knowledge and belief, in our six council areas out of the seven in the West Midlands, ​
    Network Rail has never allowed passenger trains and stations to return to what are now, freight only lines.  Did you know that?  Is there anything you can do to stop this piece of complete idiocy, please?
  12. In summary, in my opinion, stop all light rail plans until the heavy rail network in Brum and the Black Country is fully used, open and is at least as good as the average on the mainland of Europe.  And, until additional tunnels are built on both approaches to New Street Station - "the UK's rail congestion bottleneck", according to the BBC's Peter Plisner from very many years ago.  This applies, even more, after £600 million has just been spent/wasted in dealing with, not rail and road congestion but passenger congestion - to improve the passenger experience while we all wait for our delayed or non-appearing trains!!
Having just listened to a wonderful and amusing Radio 4 programme on 'Archive Hour' about complaining, is there anything here that you think, Mr Austin, might be a justifiable cause of complaint over the work of our transport experts and professionals; officers and members?

Tuesday, 13 January 2015

The tram train on the Black Country Rail Line

Here are my points for being apprehensive over ultra light rail going on the Black Country Line:
  1. It gives you all an excuse for further delay to get down to increasing rail capacity, especially when it is so important to take the pressure off New Street Station.
  2. Once ultra light rail is in place, it will be very difficult not to extend it in bite sized chunks, as was the intention with Metro.  The bite sized chunks business never materialised for Metro, so that is a bad omen for very light rail.
  3. Once ultra light rail is in place, it will be difficult to then rip it up and replace it with heavy rail.  Better to put back the everyday, well tried and tested, heavy rail trains, with stations.
  4. Heavy rail can be put back quicker than an innovative tram train that still needs much development.
  5. Nick Mallinson confirmed that what his WMG is developing is unheard of on the mainland of Europe that is generally considered to have an excellent rail service from Spain and Italy to Scandanavia.
  6. Ultra light rail would be ideal for urban areas that have no heavy rail tracks already in place.  Best to use existing heavy rail tracks for heavy rail trains.
  7. Nick wants one track as a test track and the other one for a shuttle service for the tram train.  From John Parry's experience in taking very many years to put his already tried and tested PPM on the Stourbridge branch line, it is bound to take a similar number of years to get permission for the tram train to be able to be safe for a public service.
  8. John Parry had his own circular test track for many years at his business address in Cradley.  Should Nick not be using that?
  9. In other words, it will take years for the tram train to be safe and sufficiently reliable for a public paying shuttle service between Castle Hill and Dudley Port.
  10. There are two possible better locations for an innovative vehicle to be tried and tested.  One might be the open space that once took the Dudley to Wolverhampton rail line before it was built on, further on.  There is space there for them to test the tram train between Station Drive and on to the rear of the Black Country Museum and directly to the Dudley Canal Trust.  The other might be the old line, branching off the Black Country Line, from Silver End in Brierley Hill, through Brockmoor to Pensnett.