Hi Tim
Thursday, 24 November 2022
Walsall housing energy and transport
Monday, 14 November 2022
X1, X2 and Sprint
The main city centre stop for the X1 and X2 is by Moor Street Station (at the side opposite Selfridges). These services also serve the Digbeth coach station and the markets.
Phase one of the Sprint project involved the installation of infrastructure on the highways including bus lanes and junction upgrades to offer buses priority. It is these which have improved reliability of service and journey times on existing services such as the X1 and X2.
The second phase will install more of these priority measures as well as see the introduction of a direct bus service linking Walsall, Birmingham City Centre and Solihull.
Aside from this TfWM is working with partner councils on developing further bus priority measures and routes over the next five years using funding from the City Region Sustainable Transport Settlement (CRSTS). These will be announced in due course and subject to usual consultation and approval processes.
Can you please assist us by sending all future enquiries to the Customer Relations team directly via customerservices@tfwm.org.uk
Wednesday, 29 December 2021
Railways neglected in favour of trams reintroduced
Many thanks for this, Donald. As you wrote, Wolverhampton to NE England via Walsall railway hub instead of Brum is one way of raising the importance of the full 120 Kms Black Country Bypass Brum Railway between Worcester and Derby.
Hello Tim,
Thanks for this. I won't add a lot as what you write is essentially correct. Network Rail identified this route many years ago as a potential freight corridor and I have had assurances from them the the bridge replacement work is being carried out to heavy rail standards in order to future-proof the line for these developments. The view that the route is only a "potential light rail corridor" is parochial and does not look at the bigger picture. Birmingham New Street station is running at capacity and cannot cope with any more NE/SW traffic. The Camp Hill line is being developed for passnger use so this route will also be severely constrained for future freight use.
This route has also been identified by Railfuture for future development as a freight route.
I would also add the with the imminent re-opening of rail services between Wolverhampton and Walsall that there is now an improved potential for direct links between Wolverhampton and NE England, by-passing Birmingham and giving considerable time savings.
I would say as a general rule that trams should run on strets and be complimentary torail services on the exisiting heavy rail routes. This has been continental practice for many years but, of course, we never look to see what other countries are doing. We could learn so much - HS2 included!
Best wishes,
Donald
Thursday, 4 March 2021
This is either a scandal or, an April Fool that never ends and never will!
Dear friends
After your conversion of our mainline railway to tram line, with steel rails coming to our roads and pavements to add to road congestion; with now trams on our roads, too and a slower public transport journey in our multi-mixed up public transport scene of more changes, we now have PLASTIC GRASS to replace perfectly good paving slabs and tarmac! Just paint them green!
What is going on? Don't bother, please! JUST BOTHER TO READ THIS MERRY TALE, BELOW! Tim
Our politicians and transport planners completely destroyed our tram network in the 1950s.
This was followed by them destroying about 100 Kms of our regional railway lines and keeping passenger trains off 50 Kms of lines only allowed to have freight!
Sunday, 25 October 2020
LISTEN to this train driver who knows what must be done
So yes, there is on going investment in heavy rail in the West Midlands, however in the Black Country things are different as we know.
Tuesday, 12 June 2018
We have a winning, knock out argument!
Tuesday, 1 March 2016
Corrupt transport practices
- 78 Km of unused or goods only, double track rail lines alongside/near congested roads in the Black Country and Birmingham.
- Further 58 Km from Walsall to Derby via Lichfield is still not available for passenger trains.
- 2 important rail curves still not built - after 50 years.
- £750 m (all rail money?) for Grand Central Shopping Centre with the main line station tagged along as an afterthought and stuck in the basement.
- Now, plan for transport money going for subsidising M6 Toll to further reduce the amount of money for urban Beeching rail reversals in the Black Country and Brum.
- The W Midlands Combined Authority remains corruptly biased towards road schemes; secondly, towards super expensive tram extensions in Birmingham city centre; thirdly, £12 m for a second rapid transit mode to duplicate the first, trams. What little money is left over may then go to Brum rail schemes
- Beeching rail reversals continue to be sidelined in the Midlands.
- It is the UK's last remaining, easily reinstated north-south main line railway between Stourbridge and Derby. Therefore, the most important unused rail line.
- The only one between train congested Grand Central Shopping Centre/basement station and the Hereford to Shrewsbury Line
- 74 Km between the two towns of Stourbridge and Derby.
- 21 Km between Stourbridge and Walsall that urgently needs to be reinstated first.
- This would be only the 3rd Beeching reversal in 50 years in the Black Country and Brum.
- Only 12 Km needs to have the track relaid and four stations rebuilt to give everyone 21 Km of passenger line, once more.
- COST: 12 Km x £6 m per Km = £72 million, including the stations (based on Beeching rural rail reversal in Scotland last year).
- It reduces chronic and worsening road and rail congestion in the Black Country and Brum.
- Quicker, simpler, cheaper and easier to achieve than 12 Km of road and rail running trams that the councillors and Centro officers have failed to achieve in 35 years of trying.
- If they were ever to succeed, it would destroy for an eternity and beyond, the possibility of passenger trains from London Paddington and the North being seen again in the Black Country!
Tuesday, 10 November 2015
Extravagance for London, Scotland and Brum; austerity for Dudley, Sandwell and Walsall
MOVING HEAVEN AND EARTH
WORK TO STRUCTURES
LAYING THE RAILWAY
Thursday, 23 July 2015
Letter from Cllr Peter Lowe, Leader of Dudley MBC
Dear Mr Weller
Re The Rail Crisis and HS2
Further to your letter to the Times of the 29 of June copied to the Council I would make the
following comments.
I am sure you will be aware that the Staffordshire line fell to Dr Beeching’s axe in the early
1960’s as part of swinging cuts to those parts of the railway network which were uneconomic in
this case for passenger heavy rail services. Although it continued to be used for freight services
the line was finally mothballed in the 1980’s.
The reintroduction of heavy rail services on the Staffordshire line, as you discuss in your letter,
has been investigated a number of times since its closure but has proved to be as uneconomic
as when it was originally closed in the 1960’s. Unfortunately heavy rail cannot deliver the
frequency and accessibility provided by the latest tram technology and so although apparently
easier to implement struggles to compete in the inter urban context.
The Black Country District Councils, although still strong supporters of the Metro proposals,
recognise the difficulties in bringing them forward. We have therefore recently commissioned a
new rapid transit study to consider the best way to deliver improvements to passengers’
services and in particular utilising the abandoned rail lines. I believe you may have provided
input to the study being overseen by Walsall Council on behalf of the Black Country.
With regard to the development of a new lighter and cheaper light rail passenger system known
as Very Light Rail you will also be aware that Dudley Council are working with Warwick
Manufacturing Group to build an innovation centre at Castle Hill. I can assure you that the
centre which will include a test track on the mothballed line will not affect any of the current
proposals for passenger services or the need to reintroduce freight services at some future date
as demand dictates. The development of the centre and of the technology it will produce is not
a pre-requisite for its use in the Black Country but I assume if successful could be considered at
some future time.
I hope this clarifies the situation and allays some of your concerns regarding the future
reintroduction of passengers’ services on the old Staffordshire line.
Yours sincerely
Sarah Norman Peter Lowe
Chief Executive Leader of the Council
Cfi. M.Holloway - Head of Traffic & Transportation
Friday, 17 April 2015
Position statement on rail re-openings
Wednesday, 10 December 2014
e-petition for the Black Country Rail Line
1) After 34 years of trying but failing to get trams, cancel the fruitless endeavour and return existing trains and rebuild the stations.
2) Trams were only for the middle section, anyway!
3) Return, instead, trains to the full length of 13.5 miles of mothballed, double track rail line through three densely populated Black Country boroughs - Dudley, Sandwell and Walsall.
4) It runs alongside or close to commuter congested roads.
5) This forgotten, strategically vital, train line connects at either end with the national rail network.
6) It would relieve some of the chronic road and rail congestion at New Street Station in Birmingham by creating 13 miles of more rail capacity in the adjacent Black Country.
7) It would give rail passengers from all over the UK an opportunity to visit the Black Country (especially, the Museum, Zoo, Canal Trust and Merry Hill Shopping Centre) and give Brum a miss - for once!
The Black Country Rail Line (BCRL) re-opening proposal
- It runs through three of the four Black Country boroughs and connects with the national rail network at either end - at Stourbridge Junction and Walsall (a major rail hub), via Castle Hill in Dudley.
- It is shown on every map of Birmingham and the Black Country, including the Ordnance Survey, the A-Z and Google Maps.
- The current proposal to put Metro trams on the middle section only has failed to materialise in 34 years of our councillors and officers trying so very, very hard. Time, now, to try the simpler and cheaper solution of trains and stations returning, linked to buses to take passengers to and from the trains.
- The BCRL will improve capacity on our national rail network more quickly, more cheaply and with less impact on human climate change and resource depletion than HS2.
- It will reduce congestion at the UK's foremost rail congestion bottleneck, New Street Station by allowing inter-city and commuter trains to bypass New Street.
- It will give choice to car commuters sitting in nose to tail traffic to leave their cars at home and get to work quicker and more responsibly by bus and, train on the BCRL.
- We have had hundreds of millions of pounds spent building the Black Country Spine Road and the Black Country New Road and the more recent grade separated junction on the West Bromwich Expressway. Now, its time for trains to reduce road and rail congestion - and air pollution and greenhouse gases.
- I think, Cllr Will Duckworth supports trains and stations being put back on the line from what he told me at the November GP meeting. He did not realise that it went on to Walsall.
- In the last decade, hundreds of people supported my two Downing Street petitions for trains back on our existing 20 miles of double track rail lines that includes the six miles alongside commuter congested Alcester Road and Moseley Road (A435).
- Spending £200 m on the 13.5 miles BCRL is more responsible and cost effective than more road building and HS2 to improve capacity.
- At a time of supposed austerity, £600 m is being spent on a cosmetic revamp of New Street Station that does not improve rail congestion or, road congestion to the Drop and Go parking (actually, Stop and Crawl through the exhaust fumes polluted tunnel - in peak times).
- The two leaders of Walsall and Sandwell councils are sympathetic to having trains returning to the whole length instead of trams on the middle section, only. I have not yet asked the new Dudley leader, Peter Lowe what he wants. Birmingham and their leader, Sir Albert Bore, wants more Metro trams, more HS2 and is not interested in the Black Country Rail Line (from his response when I spoke to him on the 5 December at his advice bureau in the Council House).