Thursday, 24 November 2022

Walsall housing energy and transport

Hi Tim 

Thank you for the emails with the info.
Have seen similar  articles.One the problems arise from the high cost of heating low income people would not be able to keep their heating on to keep the damp a way
It recommends opening windows or leave the windows open Heat can go through the open window which adds to the cost also on damp and rainy days moisture can also enter in to rooms thus can be a stalemate 
Regarding HS2 this should be mothballed and the money saved for better local transport eg low cost or free transport or used to help offset fuel cost to the most vulnerable.

Walsall are cutting back on street lighting some street lights have been turned of about 6 lights turned of close to my street and have been told other areas are the same 
Walsall have stated no Christmas lights in the town centre this Christmas.

I agree with  most of your comment regarding the issues you raise on the trains and other transport. Some times I feel we should go backwards but use modern technology 
In the 50s/ 60s and before Walsall had its own goods station goods yard where by goods would be delivered via railway and re loaded onto small 3 wheeled vehicles (lorries)
Who then delivered the local goods to shops and other businesses.
With the increase of online shopping there is an increase  in courier services delivering small packages to individual homes so an increase in small van traffic. 
House building planning is centred around the car not people or public transport.
I"ll get off my soap box now.
All the best
Regards

Monday, 14 November 2022

X1, X2 and Sprint

The main city centre stop for the X1 and X2 is by Moor Street Station (at the side opposite Selfridges). These services also serve the Digbeth coach station and the markets.

Phase one of the Sprint project involved the installation of infrastructure on the highways including bus lanes and junction upgrades to offer buses priority. It is these which have improved reliability of service and journey times on existing services such as the X1 and X2.

The second phase will install more of these priority measures as well as see the introduction of a direct bus service linking Walsall, Birmingham City Centre and Solihull.

Aside from this TfWM is working with partner councils on developing further bus priority measures and routes over the next five years using funding from the City Region Sustainable Transport Settlement (CRSTS). These will be announced in due course and subject to usual consultation and approval processes.

Can you please assist us by sending all future enquiries to the Customer Relations team directly via customerservices@tfwm.org.uk 


Wednesday, 29 December 2021

Railways neglected in favour of trams reintroduced

Many thanks for this, Donald.  As you wrote, Wolverhampton to NE England via Walsall railway hub instead of Brum is one way of raising the importance of the full 120 Kms Black Country Bypass Brum Railway between Worcester and Derby.

Since the correctness of Beeching sensibly closing loss making railway lines but, the utter stupidity of everyone in the railway industry and every train enthusiast then selling every single one of them for homes, offices and shops, we have been turning our railways into other purposes - turning them into anything but the kitchen sink.  A terrible tragedy that only we brilliant Brexit Brits could possibly contemplate and then achieve.

Manchester led the way by neglecting (as W Mids did) their northern railway network and, instead, from the 1980s, used their many hundreds of millions of pounds for turning roads into railway tracks for trams and many of their vital railways into tram lines.  Others, for freight only when our descendants used them for passenger and freight trains.  After decades of this weird and wonderful priority, they now want to modernise their much left behind railways in northern England with HS(too fast to stop)2.  Another climate escalating calamity to worsen our already bleak prospects.  Hopeless!

Best wishes

Tim

On Tue, 28 Dec 2021 at 15:21, Don Payne <donpayne@btinternet.com> wrote:

Hello Tim,

            Thanks for this. I won't add a lot as what you write is essentially correct. Network Rail identified this route many years ago as a potential freight corridor and I have had assurances from them the the bridge replacement work is being carried out to heavy rail standards in order to future-proof the line for these developments. The view that the route is only a "potential light rail corridor" is parochial and does not look at the bigger picture. Birmingham New Street station is running at capacity and cannot cope with any more NE/SW traffic. The Camp Hill line is being developed for passnger use so this route will also be severely constrained for future freight use.

    This route has also been identified by Railfuture for future development as a freight route.

    I would also add the with the imminent re-opening of rail services between Wolverhampton and Walsall that there is now an improved potential for direct links between Wolverhampton and NE England, by-passing Birmingham and giving considerable time savings.

    I would say as a general rule that trams should run on strets and be complimentary torail services on the exisiting heavy rail routes. This has been continental practice for many years but, of course, we never look to see what other countries are doing. We could learn so much - HS2 included!

    Best wishes,

    Donald

Thursday, 4 March 2021

This is either a scandal or, an April Fool that never ends and never will!

Dear friends

After your conversion of our mainline railway to tram line, with steel rails coming to our roads and pavements to add to road congestion; with now trams on our roads, too and a slower public transport journey in our multi-mixed up public transport scene of more changes, we now have PLASTIC GRASS to replace perfectly good paving slabs and tarmac!  Just paint them green!

What is going on?  Don't bother, please!  JUST BOTHER TO READ THIS MERRY TALE, BELOW!  Tim

Our politicians and transport planners completely destroyed our tram network in the 1950s.

This was followed by them destroying about 100 Kms of our regional railway lines and keeping passenger trains off 50 Kms of lines only allowed to have freight! 

Their next trick was not to stop the destruction of further railway lines and to restore the trains but, this time, to convert part of the train network to the tram network.
This, at much greater expense than putting the commuter trains back!
That first line opened in 1999 on an important commuter and regional railway line from Snow Hill to Wolverhampton.
But, they forgot to connect the new trams to Wolverhampton bus station or, the very last Wolverhampton railway station (out of four, originally).  It fell well short!
That first rebuilt tramline meant that 25% of Snow Hill station was taken out of railway use, together with 3 or 4 Kms of double-track railway line lost, either side of Wolverhampton Low-Level mainline station.
And the station was turned into a conference and events centre!
Now, that first tramline, to replace the perfectly good railway line, is being extended to destroy an even more important railway line.
This is the half-used but fully available (until recently), the 120 Kms railway, supposedly, "of national strategic significance" between Worcester and Derby via the Black Country!
That 120 Kms is now being broken in half for use as an extended tramline from the first, in order to take Dudley and Sandwell shoppers to Merry Hill.
Yet, it is supposed to help regenerate Dudley's rundown shopping centre, not Merry Hill!
And, worse is to follow.  It is not just a slow tramline to Merry Hill!
Our nationally important railway even gets used for a 2.2 Kms test track for Very Light Rail, too.
What was once on the national railway network going through the boroughs of Dudley, Sandwell and Walsall to Derby, may yet get ultra-light rail, because the Stourbridge Shuttle is being promoted to link Stourbridge and Brierley Hill on this same strategically important mainline railway.
All because the light rail, "bus on rails" Metro tram falls short of going all the way to Stourbridge Jct!

Remembering to finish the UK's last mainline railway with commuter and regional trains over the full 120 Kms is completely beyond our truly hopeless politicians and transport experts.
Instead, they make a dog's breakfast out of it with, possibly ultra-light rail, Very Light Rail and Light Rail all on one principal, mainline railway that was so successful as a railway.  It brought passengers from London and Oxford, even.  For 100 years!
And, Dudley will remain the largest town in the UK without its own railway station.  It wanted a piddling little shuttle tramline and tram stop instead.  It got tired of being on the national railway network.
What a wonderful joke to keep us all merry!

THIS IS THE LAST STRAW (a straw man) - what do I mean, I wonder?:

Tim Weller
declared Independent candidate for Metro Mayor 6 May 2021 to help expose this scandal/April fool and to maintain the merriment to infinity and beyond!

Sunday, 25 October 2020

LISTEN to this train driver who knows what must be done

 So yes, there is on going investment in heavy rail in the West Midlands, however in the Black Country things are different as we know.

In general it’s fair to say there is no infrastructure investment other than maintaining the present day routes, no scheme for a park and ride service at Brierley Hill for heavy rail as this is up for grabs by another parry people mover scheme.

When are we ever going to learn that when we are gifted with a part used rail route like the Dudley line, we should put trains on it and reinstate the line as it was before it was mothballed by Railtrack.

It would be a through route with no changing trains other than at Walsall maybe, far better than what’s proposed, which would take discerning travellers far longer in this day and age, hardly anyone will use it, opting to go by bus as it is direct, cheaper & will probably be quicker.

It will become a costly white elephant,and I hope that the people who have approved and endorsed this scheme of image pay dearly for it.

Tuesday, 12 June 2018

We have a winning, knock out argument!

Thanks, Andi for this.

With the 87 Kms WOM in the 90s, I was campaigning up and down the line of the route at public meetings I organised and, in two General Elections for the Green Pary - '92 and '97.  Always being positive by saying the Black Country Railway that runs parallel to the line of the proposed KBH and M5/M6 needed the passenger trains back over its entire length before building the WOM.  At that time, I was saying only as far as Walsall.  Only in this decade did the railway lobby groups tell me that it does, in fact, go all the way to Burton on Trent with double track lines but no passenger trains - 56 Kms unused, wasted, with every engineering structure in place, like the bridge over the M6 Toll!  Look at my photos:​
​​
You write, Andi that "we aren't ignoring the issue at all".  By that you mean the WOM.  That is brilliant.  What I am asking is that all greens and Greens to please campaign, from now on, for completing the 120 Kms Western Bypass Railway, aka Black Country Main Line Railway, FIRST AND FOREMOST, before anymore work on the WOM.  Our railway line that goes through Netherton is "of national strategic significance".  It must have regional and commuter trains and not "bus on rails" trams.  "Bus on rails" trams are immorally expensive and prevent the return of regional and even inter-city trains coming to the Black Country.  The authorities are deceiving us when they say we must have trams first in order to get the trains back.  It is a lie.  And, is further evidence of the longest running and biggest scandal in UK finance/transport history.  I have written reams about it over the years.

The threat of the WOM makes it even more urgent that all Greens and greens read my stuff over recent years about trains back on our existing railway lines instead of trams.  It is the most important argument to deploy to delay the WOM further.  How can anyone disagree with the parallel and nearby, unused main line railway being given top priority over the WOM?  We have a winning, knock out argument!

With Dudley GP on board we can stop the trams stopping the trains AND stop or, at least delay, the WOM in the process.  Do you all now get the importance of what I have been writing about for years?

Please don't ignore what I am saying and please help me!!  This campaign to delay the WOM and get the trains back FIRST should never have been a one person campaign, as it certainly feels like to me.
Tim

Tuesday, 1 March 2016

Corrupt transport practices

This is a scandal, a disgrace and has gone on for decades.
  • 78 Km of unused or goods only, double track rail lines alongside/near congested roads in the Black Country and Birmingham.
  • Further 58 Km from Walsall to Derby via Lichfield is still not available for passenger trains.
  • 2 important rail curves still not built - after 50 years.
  • £750 m (all rail money?) for Grand Central Shopping Centre with the main line station tagged along as an afterthought and stuck in the basement.
  • Now, plan for transport money going for subsidising M6 Toll to further reduce the amount of money for urban Beeching rail reversals in the Black Country and Brum.
  • The W Midlands Combined Authority remains corruptly biased towards road schemes; secondly, towards super expensive tram extensions in Birmingham city centre; thirdly, £12 m for a second rapid transit mode to duplicate the first, trams. What little money is left over may then go to Brum rail schemes 
  • Beeching rail reversals continue to be sidelined in the Midlands.
YOU ONLY GET WHAT YOU ASK FOR!

THANKS to all those who saw the forgotten railway on Sunday, 21 Feb.  We are forbidden, even after 50 years, to have our trains back.  Don't stand for it!

If you think that every mile should be available for us to travel on by diesel train (in the first instance) and from Stourbridge to Walsall (later to Lichfield and Derby) please say so to:

Patrick McLoughlin, Secretary of State for Transport                     patrick.mcloughlin@dft.gsi.gov.uk
​Claire Perry​,  Rail Minister claire.perry@dft.gsi.gov.uk  
Cllr Bob Sleigh, Chair of the W Mids Combined Authority      rsleigh@solihull.gov.uk
Cllr Darren Cooper, Vice Chair                                        darren_cooper@sandwell.gov.uk
James Aspinall, Managing Director, Centro                   jamesaspinall@centro.org.uk
Laura Shoaf, W Mids Integrated Transport Authority                     laurashoaf@wmita.org.uk
Stuart Everton, Black Country Director of Transport             stuart.everton@wolverhampton.gov.uk

Don't forget to remind them that they do have to write an unbeatable business case first!!

Don't forget to ask them to all go down to London and pay a visit to our Patrick and Claire for them to agree the transfer of funds from the two short sections for electric trams to be used instead for the full 21 Km for diesel trains.  They have enough money in the bank already (£207 m when they only need £72 m).

THANKS V MUCH!  They must be very fed up hearing from me.  One person can easily be ignored, as I am.  Put all 7 in the one e-mail, if you like.  Think up your own cheeky or attention grabbing subject field.


THE PLANNED BREAK UP OF THIS MAIN LINE RAILWAY IS PERMANENT AND A DISGRACE:


The UK’s only unused, major, North-South main line railway is to be sectioned up into:
from south to north, we have planned,​ in order,
  6 Km: daily, 25 waggon goods trains from Port Talbot to Round Oak, via Stourbridge Jct
  4 Km: Light Rail Metro trams (£310 m for 12 Km, inclu 4 Km of road running)
  2 Km: Very Light Rail shuttle trams, through Dudley Tunnel to Cinder Bank road
  4 Km: Light Rail Metro trams (£310 m for 12 Km, inclu 4 Km of road running)
  3 Km: Empty, private space of linear wilderness of shrubs, trees, Himalayan Balsam (an illegal plant)
  2 Km: of passenger trains - Bescot to Walsall
TOTAL: 21 Km   (approx distances)

This is 21 Km of a 74 Km main line railway between Stourbridge Jct and Derby through the increasingly densely populated and road/rail congested Black Country - the boroughs of Dudley, Sandwell and Walsall, with a population of a million.  Diesels and four rebuilt stations is £72 million (based on last year’s rural Beeching reinstatement in Scotland at £6 m per Km).
My reasons​ for wanting the trains back on every kilometre (​at a quarter of the price​ of trams on 8 Km, plus road running on 4 Km)​ instead of trams on 8 Km of the main line railway​:
  1. It is the UK's last remaining, easily reinstated north-south main line railway between Stourbridge and Derby.  Therefore, the most important unused rail line.
  2. The only one between train congested Grand Central Shopping Centre/basement station and the Hereford to Shrewsbury Line
  3. 74 Km between the two towns of Stourbridge and Derby.
  4. 21 Km between Stourbridge and Walsall that urgently needs to be reinstated first.
  5. This would be only the 3rd Beeching reversal in 50 years in the Black Country and Brum.
  6. Only 12 Km needs to have the track relaid and four stations rebuilt to give everyone 21 Km of passenger line, once more.
  7. COST: 12 Km x £6 m per Km = £72 million, including the stations (based on Beeching rural rail reversal in Scotland last year).
  8. It reduces chronic and worsening road and rail congestion in the Black Country and Brum.
  9. Quicker, simpler, cheaper and easier to achieve than 12 Km of road and rail running trams that the councillors and Centro officers have failed to achieve in 35 years of trying.
  10. If they were ever to succeed, it would destroy for an eternity and beyond, the possibility of passenger trains from London Paddington and the North being seen again in the Black Country!

Tuesday, 10 November 2015

Extravagance for London, Scotland and Brum; austerity for Dudley, Sandwell and Walsall

Dear Laura and Cllr Roger

My subject heading, above is, for me, one example of one legitimate meaning of corruption.

If I may be so honest as to say so, there is this one big flaw in your argument:-

Money is no object for rail projects for London (£15 billion for Cross Rail east-west and now Cross Rail north-south in the planning at similar expense), two very expensive HS2 stations for Birmingham and tram extensions for Brum at over £100 million per mile, to end up replacing hybrid buses.  In other words, business cases are quickly written to make the business cases watertight, unassailable and more secure than Fort Knox - as we have seen with the £50 billion HS2 line - and, the very low priority rail line to the middle of nowhere in rural,depopulated southern Scotland at £10 million per mile.

Business cases are dishonest because they are always made to come up with what the right wing political masters want!  Like the cost benefit analysis that made the Kidderminster, Blakedown, Hagley motorway bypass essential to be built in the 1990s to bypass a mainly rural, dual carriageway and queues at traffic lights in Hagley (we stopped this wasteful idiocy).  So much for it being essential!

Like the business case that made Metro One essential because it would get 15 million passenger journeys a year.  It turned out to be five million every year or less and, been loss making every year ever since.  In other words, it was built under false pretences - corruption in my book.  So much for honest and accurate business cases.

In this age of supposed austerity (now in year six), you and Roger should be livid at the following weird and wonderful and very extravagant public expenditure schemes that go to London and Scotland, with crumbs from the rich man's table going to Birmingham and never the Black Country boroughs of Dudley, Sandwell and Walsall.  This, in 34 years of fruitless endeavour that must have cost millions of pounds in salaries to the team of officers and, in generous expenses to the many PTA, ITA and the Transport Delivery Committee councillors.  This is all the exact opposite of Gordon Brown's prudent economics for the poor taxpayer.  It is what you get with right wing politicians out of control because there is no checks and balances from left wing politicians like me who never get elected - until, extraordinarily, one did on Saturday, 12 September!

For me, this is all corrupt economics and nothing like living with our means, limits and boundaries of steady state green economics.

In addition, passenger numbers on our urban rail network is increasing.  The demand is clearly there for more rail lines in the rail and road congested Black Country.  More capacity is urgent.  It cannot wait until the 2040s before you work on getting diesel (or better, electric) trains on the Black Country Line.

How to build a railway:
This is how it is done at £10 million per mile - ten times cheaper than Metro in Brum city centre:


Example:

MOVING HEAVEN AND EARTH

Earthworks are often the first and most visible sign that the railway is being built. Firstly, surface layers – in this case cycle-path tarmac– are removed. The ground is then excavated down, or built up to the level where the railway line will lie. Embankments or retaining walls are built either side of the track, using earth sourced from other locations which is then stabilised or re-enforced. Some of the pre-existing embankments will also require improvement. Drainage also needs to be created, as well as installing pumps, laying pipes, building storage tanks and building culverts (drains) which allow rainwater to flow underneath, and away from, the railway. 

WORK TO STRUCTURES

There are a number of structures along the route: 137 bridges, 42 newly constructed and 95 in need of refurbishment. A variety of work is required to existing bridges in order to help them comply with safety standards and make them suitable for the railway to run over or under. We may have to demolish and re-build some structures, including the creation of entirely new roads. However, where parts of a bridge can be re-used, we will keep these in situ to minimise construction works and we only ever replace what is failing or unsuitable. 

LAYING THE RAILWAY

First we create a railway formation (the foundation on which the railway lies). This is flattened, ready for ballast to be laid on top. Ballast consists of layers of crushed stone which form the track bed and also help to drain the railway. We then level and stabilise this ballast using special machinery, before laying sleepers at precise intervals all the way along the route. Then the tracks are finally laid on top and fixed into place.

Electrification and electric trams seem to be beyond the UK's level of competence:
Now in the sixth decade of electrifying our rail network we are, still, nowhere near seeing an end to it.  The Swiss did theirs in two decades before 1939.  34 years ago we went haring off into electric trams to replace mainly trains.  Only 22 Km would have been achieved by the end of the year when we were assured that 200 Km would be up and running by they year 2000, fifteen years ago.

This summer, there was an inexplicable delay of three months when all work was stopped on two major English electrification schemes.

Are we competent in building HS2?  Should TfL come to the West Midlands to advise us?  Should we get a further opinion from the European rail industry who do know what they are doing?

Yours sincerely

Thursday, 23 July 2015

Letter from Cllr Peter Lowe, Leader of Dudley MBC

21 July 2015

Dear Mr Weller

Re The Rail Crisis and HS2

Further to your letter to the Times of the 29 of June copied to the Council I would make the

following comments.

I am sure you will be aware that the Staffordshire line fell to Dr Beeching’s axe in the early

1960’s as part of swinging cuts to those parts of the railway network which were uneconomic in

this case for passenger heavy rail services.  Although it continued to be used for freight services

the line was finally mothballed in the 1980’s.

The reintroduction of heavy rail services on the Staffordshire line, as you discuss in your letter,

has been investigated a number of times since its closure but has proved to be as uneconomic

as when it was originally closed in the 1960’s.  Unfortunately heavy rail cannot deliver the

frequency and accessibility provided by the latest tram technology and so although apparently

easier to implement struggles to compete in the inter urban context.

The Black Country District Councils, although still strong supporters of the Metro proposals,

recognise the difficulties in bringing them forward.  We have therefore recently commissioned a

new rapid transit study to consider the best way to deliver improvements to passengers’

services and in particular utilising the abandoned rail lines.  I believe you may have provided

input to the study being overseen by Walsall Council on behalf of the Black Country.

With regard to the development of a new lighter and cheaper light rail passenger system known

as Very Light Rail you will also be aware that Dudley Council are working with Warwick

Manufacturing Group to build an innovation centre at Castle Hill.  I can assure you that the

centre which will include a test track on the mothballed line will not affect any of the current

proposals for passenger services or the need to reintroduce freight services at some future date

as demand dictates.  The development of the centre and of the technology it will produce is not

a pre-requisite for its use in the Black Country but I assume if successful could be considered at

some future time.

I hope this clarifies the situation and allays some of your concerns regarding the future

reintroduction of passengers’ services on the old Staffordshire line.

Yours sincerely

Sarah Norman          Peter Lowe

Chief Executive Leader of the Council

Cfi. M.Holloway - Head of Traffic & Transportation

Friday, 17 April 2015

Position statement on rail re-openings



  • The VLR project to go at the former Brierley Hill Steel terminal site on Moor Street, with the extra 1 Km of line, instead of preventing, for ever, the return of inter-city and local trains to our last remaining, UK north-south, high speed line.
  • There is no need for Dudley Council and ITA/Centro to shuttle passengers to the high speed line in the neighbouring borough (Dudley Port in Sandwell) when, in so doing, they destroy their own high speed line they are using to shuttle the passengers the one mile.
  • They should use their own high speed line (Stourbridge, Dudley, Walsall, Lichfield) to increase rail capacity and to reduce road and rail congestion.
  • Please get down to, urgently re-opening all our 72 Km of former passenger lines in Birmingham and the Black Country, instead of keeping them for freight only and for LR and, now, VLR tram projects that never, ever materialise.
  • Where is the morality in your policy of keeping unused, double track rail lines, devoid of trains and stations, alongside bumper to bumper commuter traffic?  This is literally the case in Dudley and Birmingham.  This is your long term strategy and has been for decades.  Will you change it, please?
  • For me, it is a scandal that we are spending £100 million per mile for Midland Metro extensions in Brum city centre and £54 million per mile for Wolverhampton but, only £10 million per mile for the return of passenger trains, rail structures and stations (the 29 miles costing £294 million for a rural rail line reopening, this September) in southern Scotland!!  What on earth is going on in this supposed age of austerity, of prudent use of depleting resources and of frightening, human caused climate change?
  • Am I right in thinking that all UK rail groups support your policies, plans and priorities?  Please give me their names.
  • Why was there no public consultation over VLR (while still keeping LR) for the Black Country inter-city Line?
  • Wednesday, 10 December 2014

    e-petition for the Black Country Rail Line

    REOPEN THE BLACK COUNTRY RAIL LINE

    1) After 34 years of trying but failing to get trams, cancel the fruitless endeavour and return existing trains and rebuild the stations.
    2) Trams were only for the middle section, anyway!
    3) Return, instead, trains to the full length of 13.5 miles of mothballed, double track rail line through three densely populated Black Country boroughs - Dudley, Sandwell and Walsall.
    4) It runs alongside or close to commuter congested roads.
    5) This forgotten, strategically vital, train line connects at either end with the national rail network.
    6) It would relieve some of the chronic road and rail congestion at New Street Station in Birmingham by creating 13 miles of more rail capacity in the adjacent Black Country.
    7) It would give rail passengers from all over the UK an opportunity to visit the Black Country (especially, the Museum, Zoo, Canal Trust and Merry Hill Shopping Centre) and give Brum a miss - for once!

    The Black Country Rail Line (BCRL) re-opening proposal

    The fifty years, mothballed, Black Country Rail Line (BCRL) re-opening proposal:
    1. It runs through three of the four Black Country boroughs and connects with the national rail network at either end - at Stourbridge Junction and Walsall (a major rail hub), via Castle Hill in Dudley.
    2. It is shown on every map of Birmingham and the Black Country, including the Ordnance Survey, the A-Z and Google Maps.
    3. The current proposal to put Metro trams on the middle section only has failed to materialise in 34 years of our councillors and officers trying so very, very hard.  Time, now, to try the simpler and cheaper solution of trains and stations returning, linked to buses to take passengers to and from the trains.
    4. The BCRL will improve capacity on our national rail network more quickly, more cheaply and with less impact on human climate change and resource depletion than HS2.
    5. It will reduce congestion at the UK's foremost rail congestion bottleneck, New Street Station by allowing inter-city and commuter trains to bypass New Street.
    6. It will give choice to car commuters sitting in nose to tail traffic to leave their cars at home and get to work quicker and more responsibly by bus and, train on the BCRL.
    7. We have had hundreds of millions of pounds spent building the Black Country Spine Road and the Black Country New Road and the more recent grade separated junction on the West Bromwich Expressway.  Now, its time for trains to reduce road and rail congestion - and air pollution and greenhouse gases.
    8. I think, Cllr Will Duckworth supports trains and stations being put back on the line from what he told me at the November GP meeting.  He did not realise that it went on to Walsall.
    9. In the last decade, hundreds of people supported my two Downing Street petitions for trains back on our existing 20 miles of double track rail lines that includes the six miles alongside commuter congested Alcester Road and Moseley Road (A435).
    10. Spending £200 m on the 13.5 miles BCRL is more responsible and cost effective than more road building and HS2 to improve capacity.
    11. At a time of supposed austerity, £600 m is being spent on a cosmetic revamp of New Street Station that does not improve rail congestion or, road congestion to the Drop and Go parking (actually, Stop and Crawl through the exhaust fumes polluted tunnel - in peak times).
    12. The two leaders of Walsall and Sandwell councils are sympathetic to having trains returning to the whole length instead of trams on the middle section, only.  I have not yet asked the new Dudley leader, Peter Lowe what he wants.  Birmingham and their leader, Sir Albert Bore, wants more Metro trams, more HS2 and is not interested in the Black Country Rail Line (from his response when I spoke to him on the 5 December at his advice bureau in the Council House).
    ALLOW THE BLACK COUNTRY TRAIN TO TAKE THE STRAIN!

    Friday, 14 November 2014

    "Revealed: £4bn plan to get city moving" Post 13 Nov

    In nearly fifty years of living and working in Wider Birmingham I have seen umpteen of these magnificent transport plans that promise so much and deliver so little, if anything.

    I came to Brum in the 1960s when the Victorian New Street Station had just been demolished and rebuilt to be a virtual underground station filled with poisonous diesel fumes.  In the 1970s, the Victorian Snow Hill Station went the same way - bulldozed.  Realising their error, it was quickly rebuilt but, to only half its former grand size.

    In the 1980s and 90s, Midland Metro trams were all the rage but, by 2000, instead of nearly half a dozen new tram lines to replace trains and buses, we had a measly ONE and that was almost entirely built on a rail line that should never have had its trains removed!  Even then, it was never extended to New St Station.  Extraordinary!

    In this year of our Lord and Master, Cllr Albert Bore - 2014, we STILL have the six miles double track rail line through Kings Norton, Kings Heath and Moseley without stations or trains.  Nose to tail rush hour congestion alongside an empty double track rail line.  Scandalous!

    In addition, we have the 13 miles of the Stourbridge, Dudley, Walsall double track rail line also devoid of trains and stations.  It goes within half a mile of the Merry Hill Shopping Centre, almost next to Dudley Zoo and Castle, very near to the Black Country Living Museum, links with the West Coast Main Line and our precious, one and only tram line at Wednesbury.  Empty of trains; not even any ghost trains.  Fifty years of unparalleled negligence and, after the stupidity of the line being closed in the first place!

    The one triumph was the re-opening of the cross rail line from Longbridge to Four Oaks.  Amazing!  How was it done?  Nothing like it has ever been seen since by our pie in the sky transport experts.  But, today things have changed for ever by these same visionary transport officials.  We can now rest happy in our beds knowing that things are looking up - at long last!