Showing posts with label monorail. Show all posts
Showing posts with label monorail. Show all posts

Saturday, 26 November 2022

To my personal, v young, ward councillors

Good to meet you both at the last community forum.  As a retired old gentleman of leisure and pleasure, I'm still available at any time and any date to show you:

  • where the short-lived 1990s monorail went and how it fell short of a vital connection that only added to the tragic incompetence of the scheme;
  • the one and only monorail station that can still be seen and is preserved for occasional, anniversary viewing from inside the shopping centre;
  • my guerrilla garden up against the rusty, metal sheet piling that is due to be destroyed by the 400 metre concrete and steel viaduct on top of it;
  • the route of the devastation wreaked by the Metro across the only public open space at Merry Hill and this:

  • 10,000 sq metres at Daniels Land and High Plateau designated for housing but has nature now got the upper hand at Daniels Land and should it be left to enrich biodiversity?
Tim

Monday, 23 October 2017

The Land of Make Believe or, You Can't Make This Up if You Tried!

The Land of Make Believe or, You Can't Make This Up if You Tried!

This must be the biggest and longest running scandal in UK transport history -passenger trains kept off freight only railway lines and mothballed (or, 'out of use' designation ignored), alongside traffic choked roads and motorways!

This is all about the four Black Country boroughs and, supposedly, the Second (worst polluted) City in the land.  The Black Country and Birmingham - both bereft of sense; abounding in idiocy and bursting with incompetence.  Here are 40 points as the evidence for such a scathing but accurate description.  There is even more sad evidence - Metro One and Snow Hill Station - that I have not included, here (but see ** at foot).
I think, the excuse for inaction and wrong action by the railway experts at Network Fail is, "Well, we have to spend all our days writing reports, strategies and studies, don’t we?  Don’t blame us.  We’re just doing our job".  Thus, they end up:
  1. ​Running homes, cars and shops ​down urban railway lines alongside main roads with bumper to bumper traffic (very mixed up kids run our transport, here in the West Midlands).
  2. Putting Homebase on Kings Heath railway station, while still running some passenger trains on the line!
  3. Forgetting to put trains and stations on the UK's only, it's all there, unused but easily reinstated, double track, mainline, strategic railway.
  4. Even the Ordnance Survey think it is a working railway line in the Black Country section!  See all their latest maps.
  5. Spending many millions of pounds on the underpasses and bridges as main roads have been widened and motorways built to cross this same strategic railway of phantom trains and invisible stations.  
  6. In 2014, planning a test track for 2 Kms on the same unfinished, 120 Kms mainline railway to shuttle passengers to the next mainline in the neighbouring borough!
  7. Then being told, "But we want it for Metro trams and have done so since the early 1980s."  This was in 2015.
  8. These idiots - sorry, experts at Dudley Council - should have known that.
  9. "Well," they said, "We'll just have to send the test track in the opposite direction through Dudley Castle Hill tunnel, then."
  10. Next, putting it about that they have only done so because the test track needed the 'not one brick out of place', double track railway tunnel all along!
  11. So why did the Warwick Manufacturing Group not tell them that in the first place?  Or, was someone lying?
  12. Building a monorail at Merry Hill Shopping Centre in the late 1980s and failing to connect it to the unfinished, with all the double tracks in place, 120 Kms mainline railway - the Black Country Railway, as I call it.  It fell short by 400 metres!
  13. The monorail was built by the foremost and well respected Swiss engineering company, Von Roll.  But they closed it after about two or three years in the early 1990s.
  14. Next, they sold it and reports indicated it went to Sydney.
  15. Our railway experts spent £750 million (of railway money?) "to enhance the passenger experience" at New Street Station.  Quote is courtesy of David Golding of Network Rail in a phone conversation with me in 2014 or 2015.
  16. Now called 'Grand Central Shopping Centre and Diesel Perfumed Station Tagged Along as an Afterthought in the Basement of the John Lewis Store'.
  17. GCSC&DPSTAAAAITBOTJLS for short!
  18. This must make it the longest name for a railway station outside Anglesey.
  19. The longest name and the longest waits for trains!
  20. Because, they are still failing to build the additional railway tunnels at both approaches to GCSC&DPSTAAAAITBOTJLS.
  21. Negligent Rail failed to do so even when all the buildings above the existing tunnels had been razed to the ground!
  22. And, twice too - at first Brindleyplace (80s/90s) and, then, when the Bull Ring Shopping Centre was rebuilt (90s/00s).
  23. Failing to realise that they could have then, easily, put in the cut and cover tunnels (and even additional platforms, according to Railfuture).
  24. Failing to twig that they could have "enhanced the passenger experience" by getting railway customers away on their trains more quickly and efficiently by building the tunnels and platforms when the obvious opportunities arose.
  25. Illiterate economics in replacing buses and trains with electric trams at 4 to 14 times per Km more expensively than simply using diesel trains on important railway lines.
  26. Each new tram is ten times more expensive than a new bus.  (FoI answer)
  27. Only local "bus on rails" * trams ever go on railway lines; rarely, regional and national trains.  (the rarity was the 6 Kms from Smethwick Galton Bridge to Moor Street Sta; and, Walsall to Rugeley - but, this took 50 years!)
  28. 11 Km Wolverhampton to Walsall railway line was tried but it was never extended to Brum via Sutton Park or to Derby via Lichfield and, therefore never got enough passengers.
  29. It has been closed for some years but, it is this 11 Km that they want to resurrect, a second time, rather than returning the trains and stations to the unused 56 Kms out of the 120 Km Black Country Railway.
  30. We run trees, trams, a test track and goods trains on our 120 Km Black Country Railway.  Aren't we clever?  (Actually, 64 Kms are normal with useful passenger trains.  56 Kms only are wasted or destined to have slow, "bus on rails" * trams!)
  31. We can't blame Beeching.  Only today’s transport experts.  Simply because train services that were hardly used in the 60s should have been mothballed and not sold off, piece meal and lost for ever.  What complete stupidity!  The railway industry is wet behind the ears; is walked all over and, yet even today, good transport infrastructure is still wasted!
  32. Our local and regional transport bosses are all subservient to Network Rail.
  33. When this mighty organisation tells them that they don’t need the Black Country Railway until the 2040s, at the earliest, and then only for freight, the other transport bosses roll over, meekly accept it and start (in the 1980s) to turn it into a tram line!
  34. Wasted and many kilometres of destroyed railway lines are the everyday business of Network Rail.  This government agency in the public sector has no interest in its own infrastructure so local and regional transport bosses come along and take over the railway lines from them to use as tram lines, housing, shops, test tracks and linear woodland!
  35. See ‘The Times’ report of 12 October 2017 by Graeme Paton, ‘Network Rail’s upgrades monopoly shunted aside’.
  36. Our, “still a very old Victorian railway” was spoken about by Sir David Higgins, Chief Executive of Network Rail on the ‘Today’ programme on 8 January 2013!
  37. He mentioned, “500 Victorian signal boxes and 300 are from the 1960s”.
  38. He spoke, in 2013, of Network Rail having £37 billion to spend in one year.  Now, ‘The Times’ report has, “Government investment in the railways of £4.2 billion was the lowest level in 15 years.”
  39. Yet, the budget on defending the UK from attack by foreign forces is now 2% of GDP and is going up, in real terms, by 0.5% in every year of the present administration!!  (BBC ‘Today’ website earlier in the year)
  40. Thus, top priority for two new aircraft carriers (£7 billion) that are the biggest and best ever but, now need a flotilla of warships around them for protection.

* as used by one Director from UK Tram Ltd and the Croydon MP on the Radio 4 ‘Today’ programme, the day after the Croydon tram crash that killed seven passengers in November 2016.

** Metro Two, the extension that cost over £60 million/Km to take it to Grand Central Shopping Centre and Diesel Perfumed Basement Station means that there is no longer a tram stop for Snow Hill Station - since 2016.  The tram bypasses Snow Hill completely and goes straight to Grand Central.  Yet, it was built to connect Snow Hill with Grand Central!  Platform 4 at Snow Hill Station is still wasted and unused.  It would still be in use to this day if they had only put back the much more cost effective, financially prudent and responsible trains all the way to Wolverhampton Low Level Station (now no more).

Metro Three to Edgbaston is costing £75 million/Km for the 2 Kms to the west of Five Ways from Grand Central.  Putting diesel trains back on our Black Country and Brum 106 Kms of mothballed/wasted or freight only railway lines would could cost no more than £6 m/Km, according to the 2015 Borders Railway rebuilding (not needed for ours) to the middle of nowhere in the back of beyond but, beautiful Southern Uplands.

Tim Weller 14 October 2017

Friday, 26 June 2015

14 examples of public money misappropriated in Brum and the Black Country

TO RAIL MINISTER, CLAIRE PERRY and other eminences for their action - please

Dear Claire - and copied to four members of the Lords and my own MP, James Morris

I know you are not my MP.  I am trying to get my own MP, James Morris (see below) to arrange an appointment with you and Patrick McLoughlin.  Please will you see us?  I believe you are from Bromsgrove, Claire - not far from my home of Halesowen where I am writing this.  Therefore, you must know what I have written here is correct.  My concerns:
  1. Millions of pounds squandered in destroying our Birmingham and Black Country tram network in the 1950s.
  2. Millions of pounds squandered in destroying, in B'ham and Black Country, about 100 miles of our urban rail network in the 1960s.
  3. Millions spent in demolishing stations and building fast roads, homes, hotels and trading estates on about 50 miles of the 100 miles.
  4. 12 miles of an urban train line turned into a tram line costing tens of millions of pounds.
  5. Nearly 50 miles of former passenger and freight lines, still used only for freight in the last 50 years.
  6. In that same decade, millions of pounds wasted in demolishing New Street Station and rebuilding it to make for an underground mainline station perfumed with coal and diesel smoke on the enclosed platforms.
  7. In this decade £700 million misappropriated to address passenger congestion at New Street and nothing about train congestion.  £700 million to turn it into Grand Central Shopping Centre with the station demoted to the basement; tagged along as an afterthought.
  8. Millions misspent with demolishing Snow Hill Station in the 1970s, only for it to be rebuilt to half its former size.  Now, new plans for a new station!
  9. Many tens of millions misallocated since 1981 for building a 200 Km, £500 million tram network by 2000.  Yet, only one tramline of 22 Km, finally, may get completed by Christmas with the extension to Grand Central Shopping Centre and station but, still no connection to Wolverhampton Rail Station, as we did have in the days of trains using that line.
  10. Electrification started in the 1950s but, still, nowhere near being completed.
  11. Nationally, £1 billion spent in the 1990s in privatising our UK rail network instead of modernising it.
  12. Network Rail refuses to co-operate with returning local passenger and ICE trains to the Black Country Rail Line, with its extension to Lichfield.
  13. Millions squandered in building and then removing a monorail at Merry Hill Shopping Centre in the 1980s but then failing to connect it to the Black Country Line at the Waterfront in Brierley Hill.  The monorail fell short by only 400 metres.  No connection, no passenger trains were allowed on the Black Country Line; therefore, too few shoppers and office workers were using the monorail, so it was quickly closed!  Sheer incompetence by the transport authorities.
  14. The West Midlands Integrated Transport Authority, Network Rail and Centro have spent millions over the years writing studies and strategies, plans and policies.  Umpteen glossy brochures have been produced with their expensive intents for the future.  Yet, very little is actually delivered.  It has all resulted in the above scandal stretching over six decades and with no sign of any reform or even small improvement.
Please will you see James and me?

Sunday, 15 March 2015

One horrible history of truly terrible transport!

SUMMARY
Lord Beeching still lives on at Centro House, Integrated Transport Authority, Dept for Transport and Network Rail.   You all fully co-operated with the idiocy of Beeching and went even further than him by not mothballing lines and - wait for it - building on them!  You also put light rail (LR) and, now, very light rail (VLR) on heavy rail lines instead of simply re-opening them for existing passenger trains.  Beeching lives on with the stupidity of 72 Km of freight only lines as we go into the next fifty years of increasing road and rail congestion in Birmingham and the Black Country!  And, Metro extensions in Brum centre simply mean modal shift from bus to tram; cyclists being put off by tram lines that send us crashing to the floor (as Richard Hammond found); and, even more crowded roads with cars, trucks, vans, lorries, buses - and, now, trams to add to the mayhem.  Perhaps, it might encourage us to walk more!

IN GREATER DETAIL
After about 100 years of successful train travel for our ancestors, your predecessors in Rail HQ had a brainstorm in closing and not even mothballing over 100 miles (160K) of rail lines (in Birmingham and the Black Country) of which there are still left the 45 miles (72K) that were safeguarded for freight only.  I wanted you both to check the distance (on my map, above) to confirm that for 100 years they did have passenger trains and to reassure me that existing diesel passenger trains and stations could return to all of the remaining 45 miles.  If necessary, freight at night and passengers in the daytime.

PTA/Centro put light rail trams (not trains back) on 11 miles of the 100 miles of closed rail lines.  This was in 1999 after 18 or 19 years of work on Midland Metro Line One.  Even then, as you told me yourself, Toby it was never extended to New Street Station, as PTA/Centro obviously should have done.  More incompetence when the tram line (unlike its predecessor, the perfectly good train line) was not connected, even, to either rail station in Wolverhampton!  Only now are you connecting the tram to the one and only rail station that is now left in Wolverhampton.  But, what a lot of wasteful effort and money in closing the rail line fifty years ago and, only now, are you getting back to completing a rail link between Snow Hill and Wolverhampton station.  A rail line that could have been left well alone in the 1960s in a growing and ever more populated and congested urban conurbation.  Yet, all the transport authorities and even trade unions fully co-operated with Lord Beeching in closing and, sometimes selling off, the miles of urban rail lines he wanted closed.

PTA/Centro chose the further station (Snow Hill) from New Street rather than the nearer Moor Street Station to connect New Street with Metro trams.  They did this when they knew that all trains stop at both Snow Hill and Moor Street stations.  Therefore, it seemed more sensible to me, for the nearest station to New Street to be connected by a tram and not the one furthest away!  Or, why was the Metro not brought to Moor Street Station, as well, before going on to Grand Central Shopping Centre and Station?

I remember you telling me, Toby, that the problem of New Street Station rail congestion is down to the tunnels on both approaches.  Exactly!  So why on earth did PTA/Centro and Network Rail lose the opportunity to build additional ones, first when B'ham Westside was being developed in the 80s and 90s and, secondly, when the Bull Ring was completely rebuilt in the 90s and noughties?

£700 million has just been wasted on a cosmetic tart up of New Street Station that remains more of a shopping centre and, underground station than the magnificent Victorian rail station it was for 100 years - until the demolition and destruction of the 1960s!  Why did PTA/Centro and Network Rail not use that money towards the new tunnels that are desperately needed?  £15 billion for Cross Rail and Thames Link but nothing meaningful for Birmingham to address the real problems of inadequate rail infrastructure at sub standard, subterranean, New Street Station.  Or, why was £700 million not spent on rebuilding the grandeur of the old station and dispensing with yet more shops and stores?

An opportunity missed to address the problem of rail congestion at New Street Station.  Nothing to address the chronic and dire problems of road congestion, either, around New Street Station at peak times.  When I pick up my daughter on a Friday evening I have to park in the road called Holloway Head, on the far side of Holloway Circus from the station and, walk in to meet her.  Otherwise, it is half an hour of nose to tail traffic into the Stop and Crawl tunnel.  This tunnel is nicely perfumed with a cocktail of poisonous gases, just like the platforms of Brum's premier station.  Nearly fifty years and rising of very unhealthy and dangerous particulates from all the diesel smoke.  This is the main reason why I boycott New Street Station, if I possibly can.

In the 1980s, PTA/Centro failed to extend Don and Roy Richardson's Merry Hill monorail the remaining 400 metres to join up with the Black Country inter-city line at the Waterfront, that should have been re-opened then!  How negligent and stupid is that?

In the next decade, I visited a Victorian signal box at Round Oak on the Black Country inter-city Line and found the door closed but unlocked.  When I revisited a few weeks later, it was burnt almost to the ground.  Network Rail was Negligent Rail.

I don't suppose one of you has questioned the scandal of spending £300 million of taxpayers' money on the 48 Km rail line to the middle of nowhere in southern Scotland.  That money should have gone to the Black Country inter-city Line to relieve the chronic road and rail congestion at New Street Shopping Centre and Station.

I now read that Snow Hill Station is going to be rebuilt - for the second time - when the Victorian station should have been left well alone.  What on earth is going on?

Rail electrification is still nowhere near being completed.  Yet, the Swiss did all their electrification in the 1920s and 30s!

One further matter; and this was the final straw.  Shortly after I met with Peter and you, I learnt from a newspaper - and this was without any public consultation of any kind - that, without giving up on light rail Metro on the Black Country inter-city Line, you were now working to put Very Light Rail (VLR) on that same line, too but, for only 2 Km.  This, all of one mile between Dudley Castle Hill (that should, asap, be a stop for inter-city trains between London and Glasgow) and Dudley Port!  The 21 Km Black Country inter-city Line, had passenger trains for one hundred years, then some years of freight and not even freight since the 1980s after Round Oak.  I think it should be extended to Lichfield for existing diesel trains.  Yet, you want to put in Very Light Rail in bite sized chunks, reminiscent of the failed bite sized chunks policy of PTA/Centro when it came to Metro trams but, we will now get even slower VLR trams.  But, only when this university project has been developed, tried and tested and passed the rigorous H&S regulations - in I don't know when!

I have never before heard such nonsense, such absurdity in all my life.  Especially, when the VLR project could be developed on the Pensnett branch line from the former Brierley Hill Steel Terminal site at Moor Street to the north side of Pensnett High Street.  From Moor Street, eventually road running to the Waterfront and Merry Hill and another line to link with Stourbridge Town interchange.

Am I right in thinking that VLR is what we have with the PPM on the Stourbridge branch line for three quarters of a mile between Town and Junction stations?  For years, off and on, I was writing to Centro and to every member of the PTA, wanting John Parry's tram on this line - as well as trains back on, what I thought then was 38 miles of freight lines.  (It is actually 45 miles with the Walsall to Wolverhampton line that I had overlooked.)  It took a very long time to achieve the successful PPM.  Yet, the transport authorities are planning to put a refinement of John Parry's excellent tram, that is ideal for branch lines and road running, onto a major inter-city line!  How ridiculous is that?

I really do think that all of you, from Cllr Roger Lawrence and Geoff Inskip down and, in Network Rail, the ITA and DfT, need an earthquake to well and truly explode you into the real world that the rest of us have to get about in - but, with increasing difficulty!

Tuesday, 10 March 2015

Truly terrific transport - I don't think!


Rail in the UK
First with trains but will the UK be the last to complete electrification?  If it ever happens, of course.
Switzerland was late with their railways, according to TV film presenter Michael Portillo but, did all their electrification in the 1920s and 30s.

Rail in Birmingham and the Black Country
In our conurbation, the rocking and swinging sixties saw over 100 miles (161 Km) of passenger lines closed by our transport people and the rail workers tolling the bell for their own demise!
Is this unheard of in the EU?
Over 50 miles (80 Km) lost for ever.  Unique in Western Europe for one conurbation?

Those superb rail engineers, the Swiss, built and installed the monorail at Merry Hill Shopping Centre in the 1980s.  Just a pity that our transport professionals forgot to connect it to the heavy rail line next to the Waterfront.  And, its still there.  It is called the Black Country inter-city Line and should have been re-opened, then - 30 years ago - but they have, still done nothing to get it back in use.  Truly extraordinary!
Our transport experts not only left the monorail 400 metre short of the heavy rail line but then allowed the monorail to be closed and carted off for use, elsewhere soon after it opened!

Our transport experts are experts at experimenting with novel ways of using rail lines by sending hotels, homes and trading estates down them, eg Dudley to Wolverhampton line on the well used by passengers for 100 years, the old Oxford, Worcester, Wolverhampton Railway Company line (part of that line is the Black Country Line of 21 Km).
Surprising news - our experts are experts at squirreling away 45 miles (72 Km) some, literally alongside or, near to commuter congested roads over these last fifty years as road and rail congestion has grown.
Shock news - goods trains can use the 72 Km but not us passengers!
Bad news - of the 72 Km, 21 Km is the only unopened, mothballed, nationally important, inter-city rail line that has remained closed for fifty years!
The 21 Km Black Country inter-city Line is the only north-south railway between Hereford and Shrewsbury in the west and congested New Street Station in the east.
But, don't despair - this line will, one day, have a Very Light Rail (VLR) tram from a university group and, for all of 2 Km out of the 21 Km!
The only problem: we have to wait until it is developed, tried and tested and, passed fit for Health and Safety to allow fare paying passengers.
Hurrah!  Then, it will get extended in bite sized chunks.
Never mind, that the bite sized chunks strategy never delivered the dozen Metro Light Rail trams in 34 years.
This time, it will work with VLR, for sure, however.  Even if it does take another 34 years!
In 34 years, one Metro line (and even then not connected to Wolverhampton rail station until later this decade!)

After all, our transport professionals think it would be scandalous to allow the university students and graduates to work on their VLR on the 3 Km Pensnett branch line, that I think would be ideal.  They think the Black Country inter-city Line will be ideal for freight trains, and for Light Rail Metro and for the university Very Light Rail tram idea but never for ordinary, diesel, passenger trains instead of light rail!
Good God!  We can't have Virgin and Chiltern trains on the line to connect the Black Country directly with London, Bristol and Scotland.  After all, Dudley people are only allowed to use trains to those cities via Birmingham stations and Wolverhampton.

Great news - rural, southern Scotland has their 48 Km rail line re-opening in September to connect Edinburgh with small communities slap bang in the middle of nowhere (cost £294 million).
Bad news -Never again will Dudley, Sandwell and Walsall be connected to London, Cardiff, Edinburgh and Glasgow by the Black Country inter-city Line (cost less than £200 million).  Unless, there is a rapid change of heart.

But, good news, all of £15 billion for London's rail tunnels to open in 2019.
and nothing for additional tunnels at New Street Station to ease rail congestion there.
But, fantastic news - we got £600 million for a new shopping centre - this year, even - to brighten the rail passengers' day at a tarted up and gleaming, sun reflecting, glorious Grand Central Shopping Centre and, as an afterthought, the underground station is tagged along,  too - in the basement!
ALL IS FORGIVEN!