Showing posts with label Grand Central. Show all posts
Showing posts with label Grand Central. Show all posts

Saturday, 25 February 2023

Extravagance for the authorities; austerity for the rest of us - my definition of corruption!

Extravagance for the authorities; austerity for the rest of us - my definition of corruption!

£750 million for the grand Grand Central Shopping Centre, atrium and concourse with the mainline station put in the basement - tagged along as an afterthought.  Still, on the platforms and in the ‘Stop and Crawl’ car tunnel, poisonous diesel fumes to harm our health.  Still, no additional tunnels for the trains to ease train congestion!


£190 million magnificent New Library of Brum opened as smaller libraries closed or were given restricted opening hours.  Just like the new library in its second year of opening!


£86.6 million for Midland Metro trams to Centenary Square from Snow Hill Station (less than one mile) - to replace buses.  Cast iron business case for this profligacy, of course.


£62 million to promote cycling in Birmingham and to give away 5,000 free bikes to Brummies.  No business case of any kind, I believe.


£25 m for a tram on one line for one mile, and the test track on the other.  This prevents the Black Country ICE (inter city express) Line of 13 miles re-opening.


£10 million per mile for Beeching rural line re-opening in depopulated southern Scotland in September.  In this age of austerity, a strong business case was made.  Yet, nothing for the Black Country ICE (inter city express) Line that remains closed.


£100 million per mile for smooth, sleek electric trams to return to Brum city centre to replace hybrid buses.  In this age of austerity, a robust business case made the funding vital.  Yet, nothing for the Black Country ICE Line that remains closed.


£130 million for 1.5 Km (just under one mile) that includes some new trams for the Eastside extension.  In this age of austerity, an unassailable business case was made for the project to go ahead.  This is 13 times more expensive than reinstating passenger trains and stations on nearly 50 miles of freight only lines, like the unused Black Country ICE (inter city express) Line.


£1,000 million per mile (estimate) for HS2 to come to Curzon Street Station in 2026.  Whatever the cost, the watertight business case made this project essential.  It is absolutely vital for the transport and economic health of the nation.  Isn't it funny, that there is still nothing for the Black Country ICE Line that remains closed to passengers?


Isn’t it funny that every business case that is written strongly confirms whatever the unthinking, grey-suited, fine old politicians of ours, want?

15 July 2015

Saturday, 26 November 2022

One big Brum blunder after another

5 July 2019

It grieves me that railway managers and transport planners/experts failed to stop the running of homes, shops and offices on our railway lines since their very proper closure as loss-making in the 1950s and 60s.  All of them are now needed to reduce road congestion and train overcrowding.

It grieves me that opportunities were lost to build additional tunnels to Grand Central when Westside was being redeveloped in the 80s and 90s.
Another lost opportunity when the Bull Ring Shopping Centre was being rebuilt in the 90s and 00s.  The Eastside railway tunnels should have been built when the concrete Bull Ring Shopping Centre was demolished.

Stupidity when the free flowing, lower greenhouse gas emitting, Inner Ring Road was smashed and broken at Masshouse Circus and St Martin's Circus to make for all the traffic lights, one way streets and, thus, extra cocktail of poisonous gases with the unnecessary braking and accelerating of vehicles.  It was done to break the concrete collar round the city centre.  But the collar is now wide roads with traffic stopping and starting at traffic lights, just where people are walking and shopping!

Friday, 26 June 2020

The need for the full 120 Kms railway rather than 10 Kms of trams

I have been arguing for working as near as possible to where you live since 1978 when I started working as a social worker in Sandwell at Haden Hill, one mile up the road.  I pointed this out when they moved me to Smethwick in 1982.  I was then contributing to more road congestion!
  1. The tram is being provided to get the railway service reinstated.  You told me, "So they are paying twice to get what they really want, the trains".  (Or, words to that effect.)  Do you remember telling me that in church a few years ago, Kev?  You were spot on!  I could not have put it better.
  2. If the authorities are spending half a billion pounds (£500 m) to improve the bus service by putting "bus on rails" trams on the road and railway over 10.7 Kms, would this indicate that they are confident it will be very well used and is badly needed?  I think the project/scheme is deeply immoral.
  3. Apparently, it was much needed to reduce road congestion in the 1980s and 90s.  Therefore, why was the promise of Cllr Fred Hunt, Leader of Dudley Council in telling me, in the mid 90s, that it would be up and running by the year 2000, not fulfilled?
  4. Yet, if they spent less than £200 m they would be able to put the commuter, regional and intercity trains back, plus nine stations on the whole missing 56 Kms of the middle section between Worcester and Derby. And, it would do an equally good job as the £500 m "bus on rails" tram in connecting Dudley with Merry Hill but also, that the tram does not do, connecting Stourbridge with Merry Hill.
  5. There would have to be an electric bus service from Dudley Castle Hill railway station, where the four big tourist attractions are, to take passengers up to the rundown town centre that is Dudley.
  6. Birmingham does not want passengers to miss out their city by some passenger trains bypassing Brum and going via our four Black Country boroughs.
  7. Yet, Grand Central that Worcester to Derby trains stop at, is one of the worst railway congestion bottlenecks in the UK, according to Peter Plisner on 'Midlands Today'.
  8. Do you think that some passengers between Derby and Devon might like to come via Dudley, as they did for 100 years until the 1960s?
  9. Did you know that railway passenger numbers have more than doubled since the mid-90s?
  10. Did you know that the transport experts have turned our urban railway lines into homes, shops, offices and roads since the 1960s?  About 100 Kms in the W Mids.
  11. Do you think that this might be the reason for road congestion on the M5 and M6?
  12. Might this be the reason for HS2?  That is, to increase capacity on our railway network that is overcrowded and, "a very Victorian railway"  (Sir David Higgins, Chief Exec, Network Rail on 'Today' 8 Jan 2013)

Sunday, 21 June 2020

Richard Worrall wants cycles and railway reinstatements

Dear friends

I do understand that point, Richard and thanks so much for engaging with me.

It is much easier to have cycle-walkways alongside slower tram lines, as we have for some of the 20+ Kms between Grand Central and Wolverhampton.  That was a small crumb of comfort that you conceded in the 1990s when you destroyed 3 or 4 Kms of perfectly good urban railway line and a principal mainline station!  However, the unfinished 56 Kms are a completely different kettle of fish.  It is the middle, forgotten, wasted but vital, unfinished part of the full 120 Kms between Worcester and Derby via the Black Country.  The full length should be having even intercity trains on it, to take the pressure off Grand Central and to help our four Black Country boroughs to also flourish, like Brum.  In forty years, why have you NEVER wanted that?  Only HS2 since 2009!

At the very least, it should be having commuter and regional trains on the whole length.  In that case, it is much more difficult to put cycle-walkways alongside a narrow corridor that has fast trains back.  Therefore, the 13 Kms between Walsall and Lichfield must have the TRAINS back as the top priority before cycles and walking.  Otherwise, you are continuing to waste a railway "of national strategic significance".

Do you all get that, now?

I have even walked the existing cycle-walkway on the former mainline railway and asked two or three walkers if they would be happy with having the trains back.  One person even remembered the trains and all were OK about it and understood that one day the trains would have to come back.

You all also need to see the whole picture.  That is, the full line of 120 Kms that has tens of millions of pounds already spent on it for TRAINS and not cycles!  Every bridge, underpass, tunnel and viaduct are already built for TRAINS and not cycles.  Please, just do the full 120 Kms for the one mode of TRAINS and do not break it up into two or even three different kinds of trams, with all the attendant changing between the modes.

You say you want TRAINS, Richard!  In that case, please stop faffing about with trams and tram-trains (still trams) and do what the expert Victorian railway engineers built the line for - for fast TRAINS.  You would then have money left over to put TRAINS on the remnant of railway lines that you and your colleagues have not yet destroyed by bizarrely thinking that homes, shops, offices, roads and trams must run on them.  And, to modernise our Victorian railway!

Your really top priority for cycling and walking, after the towpaths, is the major, strategic, essential for commuting, 22 Kms Black Country Cycle-Walk Mudway to be upgraded and made usable in even wet weather.

The state of this important superhighway is totally unacceptable - ESPECIALLY IN DUDLEY.
Tim Weller

Tuesday, 16 June 2020

"Let's build new tram lines with routes where people want to go" - 'Inside Croydon' (only, please!!)

PLEASE FORWARD to Anthony and Stephen.  Everyone else please read, think and inwardly digest - to produce some creative answers for me.  Thanks.

Dear Anthony Norris-Watson and Stephen Spark


Why is it that only electric "bus on rails" trams can "take thousands of cars off our roads every day" but never electric buses linked into reinstated trains and stations?
"Bus on rails" trams was the description that Andrew Broddick of UK Trams Ltd gave on the 'Today' programme to help explain 62 injuries and 7 deaths on Croydon Tramlink in November 2016.
Why can only trams "relieve overcrowded existing routes" and not by making use of existing but wasted railway lines, with commuter trains, that would have avoided the tragedy in 2016?
Why only trams to "serve corridors where there is a high or rising demand" but never electric buses, linked into trains returned to existing railway lines, that would reduce the need for multiple changes?
Why is it always trams to "stimulate development in areas that suffer deprivation" like the four Black Country boroughs when its neighbour, Birmingham Grand Central station, remains "one of the worst railway congestion bottlenecks in the UK" - Peter Plisner,  BBC 'Midlands Today'.
Why is it always trams chosen to "duplicate existing public transport links"?
When "Funds will be tight in a post-Covid, post-Brexit environment", why only tram schemes when they are the second most expensive mode to construct after HS2 and have a higher accident rate than either bus or train?

When tram extensions are often ten times more expensive per Km to construct than putting diesel/electric trains back on even rebuilt railway lines (cf Borders Railway), why are they always chosen to duplicate, replace and make for even more multiple changes between bus, train and tram?
Why are "bus on rails" trams chosen over commuter, regional and intercity trains on two short sections of a half-finished, 120 Kms principal, mainline railway "of national strategic significance"?


There are proposals and, active plans now being implemented, for three different kinds of trams over four short sections of this nationally important, partly finished railway!!  Pre Metro shuttle tram, Very Light Rail tram and Light Rail tram.
Why complicate public transport travel in this way?

Why cannibalise unused railway lines for tram lines?  And, leave many miles of unused railway lines wasted for more decades or forever!
Has no one thought of trains for train lines that have not yet been used for the bizarre, eccentric activity of running homes, offices, shops and roads down them?
Complete amateurs have rebuilt entire railway lines.  Why can't the professionals put TRAINS BACK on existing, entire, already built railway lines?

Tuesday, 24 December 2019

Nine years of failing, actually incompetent, national government but, you remain on their side!

24 December 2019

Many thanks, Ray for responding.  It shows your integrity and you are a good man.

Very true.  I thought you were all wanting to increase capacity on the railway network to reduce overcrowding, poor railway performance, eg West Midlands Trains and to do something about "one of the worst railway congestion bottlenecks in the UK" at Grand Central Shopping Centre and Diesel Perfumed Station (Peter Plisner, BBC Midlands Today reporter).  Growth on our railway network is still being seen as the UK population continues to rise and road congestion worsens.

Perhaps, your hopeless government, after more than nine years in power might like to put trains and stations back on over 20 railway lines that the Campaign for Better Transport is wanting.  And, to respond at long last, to the science over our own human induced, looming, climate catastrophe.  You are a lot younger than me, Ray.  You should be a lot more bothered!  Over nine years of negligence over social care and NHS deterioration and immoral priorities over transport expenditure in London and the southeast, Ray.  Nearly 3,000 food banks, I believe.  More food banks than McDonald's restaurants, I read in 'The Big Issue'.  Your colleagues foolish, incompetent and immoral top priority was Brexit - since your party won the 2015 General Election.  This is scandalous.  Ray, please change your political party. 

In addition, for the Camp Hill railway reopening to be a success, does our own principal, mainline railway need to have its trains and stations back, first?  

Have a wonderful Christmas and 2020, my good friend.

Tim

Thursday, 4 July 2019

The Brexit brickwall = the tram rut = we Brits are going nowhere fast.

The Brexit brickwall = the tram rut = we Brits are going nowhere fast.  As well as by tram, train, bus or car!

"The link between Brexit and the increase in fossil fuel use" comes from the billions already spent over these last three years of referendum and, all the to-ing and fro-ing with meetings galore and documents.  The more we spend the more we use up our fossil fuel reserves. At the same time, as we burn them up, we tighten the grip of the runaway greenhouse effect to cause the collapse of the planet's life support systems.  We are all druggies addicted to fossil fuels. They have given us unheard of comfort and wealth but also a nasty and deadly downside that will continue to roll out this century, methinks.

With the over £60,000 per metre extension to Grand Central, the annual passenger journey figures have gone up to over 6 million.  This is still well short of what they said in the 1990s, in order to get the money out of government. Putting the trains back on the same 20 Kms mainline railway would have cost about £3,000 to £4,000 per metre in the 1990s.  Probably, less than that. And, of course, there would now be no need for the expensive Metro extension to Wolverhampton railway station. The nation has more money than sense. And every penny we spend tightens the screw on future devastating consequences for all life on earth from human climate change.

I was trying to be clever in making use of Donald Tusk's statement about "I have been wondering what the special place in hell looks like for those who promoted Brexit without even a sketch of a plan how to carry it safely".  I was comparing it with all those in Transport HQ, since 1981, giving top priority to trams rather than reinstating trains and stations. In addition, our councillors and officers are not at all bothered about their colleagues, in our district councils, giving planning permission for roads, but mainly buildings, obliterating 100 Kms of urban railway lines in the Black Country and Brum.  However, there is still 106 Kms that survive as freight only and mothballed, double track lines. All this destruction of transport infrastructure and refusal to countenance the return of commuter and regional trains on the 106 Kms, as railway passenger numbers have more than doubled since the mid 1990s with overcrowding on our commuter trains and longer traffic jams on our roads. Only trams are allowed.  Installing trams and tram stops is working out at about ten times more expensive per Km than simply rebuilding the stations and putting the commuter/regional trains back!!

We cannot afford to go on wasting, or misusing, perfectly good railway infrastructure, in my opinion.

Do you want our railway lines for trams or trains, Kevin?  You once said, so correctly, "We have to pay twice to get the trains back!"

Do read these writings of mine to understand what has been going so wrong:

TUSK'S QUOTE:
"We will not gamble with peace or put a sell by date on reconciliation.  (Self: The Troubles in N Ireland may restart with any difficulty between or, distancing of, N Ireland from the Republic)  This is why we insist on the backstop. I have been wondering what the special place in hell looks like for those who promoted Brexit without even a sketch of a plan how to carry it (out) safely.  The EU 27 is not making any new offer. Let me recall that the December European Council decided that the withdrawal agreement is not open for renegotiation." The European Council President, Donald Tusk.

All the best

Friday, 15 March 2019

THIS MUST BE THE ULTIMATE ABSURDITY TO RIVAL BREXIT!

Dear Brad - and copied to people who can confirm, correct or deny the accuracy of what I have written here.

You are brilliant at not being so high and mighty that you cannot reply.  You have the common decency and courtesy to engage and to engage honestly, too.  THANK YOU!  Everyone of my local politicians and officers could learn a thing or two from your fine example.

However, I still don't think it has dawned on you that the mainline railway, almost adjacent to the Waterfront, will be wasted, unused, possibly for the rest of time.  A railway "of national strategic significance" being used as a shuttle "bus on rails" tram line to 'Grand Central Shopping Centre and Diesel Perfumed Basement Station', aka New St Sta. This is a most terrible waste of transport infrastructure that has already had millions of pounds spent on it and will now remain wasted, possibly for an eternity!  You will never be connected to the NE and the SW of England by fast, regional and even intercity trains.  Instead, you are being sold a pup - when you could have a mature, grown up dog!  Instead of the tram line at double the expense per kilometre of the M6 Toll when it opened in December 2003, you could have passenger trains from all parts of the country coming to Merry Hill - as used to be the case, of course.  They came to the station in Brierley Hill, itself because your site was Merry Hill Farmhouse and farmlands and the northern part was Round Oak Steelworks - either side of Level Street.  This was the case from around 1850 in the midst of the ultimately catastrophic, climate changing Industrial Revolution.  Even then, apparently, some scientists were warning of the terrible consequences of burning fossil fuels!

I don't think you get it, Brad.  No shuttle tram but a grown up regional and even national service on the full 120 Kms.  You would be able to get about that more easily in your car when driving through the Midlands.  Some motorists will use the mainline railway to allow you to have a more pleasant drive on motorways with fewer vehicles!

Anyway, it doesn't matter that you cannot see the grand scheme that could be yours!  You must settle for very much less than the best, as TfWM/WMCA also want.  You are in good company.

14 March 2019  
I wrote all that yesterday morning.  I have woken up today and feel that I must add this.  To be blunt, you are facilitating the permanent destruction of the UK's only/last mothballed mainline railway over 120 Kms between Worcester and Derby.  The northern and southern sections are in use but the most important section is YOUR section, in the middle through the Black Country and that bypasses "one of the worst railway congestion bottlenecks in the UK", viz: 'Grand Central Shopping Centre and Diesel Perfumed Basement Station' aka New St Sta.  The intention of the 'experts' is for a railway "of national strategic significance" to be used as a shuttle "bus on rails" tram line to 'Grand Central'. This is a most terrible waste of transport infrastructure that has already had millions of pounds spent on it and will now remain wasted, until humanity is passed over in favour of other life forms!  Millions of pounds was spent in recent years for the flyovers and tunnels over the forgotten 56 Kms to allow new dual carriageways and motorways to be built.  But the idiots forgot to go on to the next step - the rather vital trains and stations!

Your Waterfront Mainline Railway station must be connected to the shops by electric buses or by electric, driverless, elevated monorail. NOT the railway "of national strategic significance" used as a piddling little shuttle tram line. The current intention is as shocking as the chaos of our government's Brexit. It was the stupid transport planners and small minded politicians who allowed an excellent top model, Swiss monorail from Von Roll to be built and opened in, I think, 1990. Yet, the foolish, ignorant, authorities failed to connect the last 400 metres, from Waterfront monorail station, to the nationally important railway at Round Oak. Even then, the much needed commuter/regional trains and stations should have gone back - in 1990! Round Oak is almost adjacent to the Waterfront that you own.

I think, Brad that only you and your company can knock some sense into the heads of the public sector top officials, politicians and 'experts'. It is your national duty to do so. Seriously!

Very best wishes

Thursday, 10 December 2015

Letter to Cllr Gail Sleigh

​
Do you agree that Bob and you should be arguing to stop wasting the millions of pounds of our European and UK taxes trying to get the network of fifteen tramlines of 200 Km by 2000 across the Black Country and Birmingham?  It was never delivered in 34 years, since 1981, of being very trying to get them.  Yet, the work continues at huge expense.

Do you agree that, INSTEAD, you could simply get Network Rail, the Combined Authority, Centro and the ITA on side to put back the trains and stations on the 78 miles of unused/underused, double track freight lines?  They all had successful passenger trains and stations for 100 years until fifty years ago.  Your colleagues in Network Rail and in Scotland have done it in rural, depopulated, southern Scotland for £300 million for 30 miles, this very year!  Reverse the urban Beeching cuts to improve our 'connectivity', too.

Now, please do it in the heavily congested and the growing population in the Black Country and Brum.  I suggest, the 74 Km Western Bypass rail line, re-opened first to also reduce the train congestion at Grand Central Shopping Centre and basement station.

Why do you all persist in putting up with struggling along congested roads, some literally alongside underused or even empty, double track rail lines?

Remember, Gail, countless business cases and transport plans to improve 'connectivity', over the decades, have been written to justify this long-running, sad, state of affairs.

With every good wish

Saturday, 5 December 2015

Just put the trains and stations back!

Business cases that tell you what you want to justify the worst value for money rail projects but never trains and stations reinstated alongside congested roads!

LET THE FIGURES SPEAK FOR THEMSELVES:

£500 million per Km (estimate) for HS2 that has to have a spur to bring it to Birmingham city centre edge.

£62 million per Km (actual cost) for Birmingham road running tram extension - very late opening in 2016

£27 million per Km (today's price) for Dudley rail and road running trams - Wednesbury to Brierley Hill.  Never delivered since Midland Metro project began in 1981.  Network of 15 lines and 200 Km by 2000 never delivered.

£6 million per Km (actual cost) for first (professional) Beeching rail reversal but in rural, depopulated, southern Scotland - opened on time in 2015.  49 Km for £294 million for single and double track to the middle of nowhere.

Therefore, £6 to £8 million per Km for my proposed 74 Km Western Bypass Rail Line to help deal with train congestion at Grand Central Shopping Centre (the station is in the basement of John Lewis!) and rising passenger demand for trains.  This is an existing, double track rail alignment (part freight) that is fully safeguarded for the last fifty years.  It goes through the heart of the industrial West Midlands, through the Black Country, from Stourbridge Junction to Derby.

£500 million for 74 Km Western Bypass Rail Line (estimate based on this year's first Beeching reversal opened).
£390 million (official ITA figure) for 15 Km trams from Sandwell Wednesbury to Dudley Brierley Hill.  Geoff Inskip, at the 18 Nov ITA mtg, was confident that the money was in the bag, after the previous week's signatures for the new Combined Authority.

BEST VALUE FOR MONEY IS OBVIOUS

SOURCES: Figures from Patrick McLoughlin Sec of State for Transport
                            from Geoff Inskip, CEO at Centro
                            from Laura Shoaf, Chief Officer, W Midlands Integrated Transport Authority

Thursday, 3 December 2015

Transport blunders in the Black Country and Brum

Rubbish railway policy in the Black Country and Brum

Bullring Shopping Centre was opened in 2003.  With rising rail passenger numbers throughout the 1990s and continuing to this day, your colleagues should have realised that additional tunnels were needed at the eastern approach to Grand Central basement station, then.  The new rail tunnels could have gone in after the demolition of the old Bull Ring and before the shops and stores were built for the new Bullring Shopping Centre.

£750 million of railway money for what is, mainly, yet another brand new shopping centre is a misappropriation of public money.  In other words, corruption.  From the BBC, I heard that Grand Central is likely to be sold to the owners of the Bullring and, Birmingham City Council will profit, as a result.  It will profit from the misappropriation of railway money when, like yourselves, they were also partly responsible for the blunder of failing to build the new rail tunnels in the 1990s.  This, when for years there had been much talk (but never any action, of course) of building an underground railway in Brum!

Both the railway industry, the DfT and Brum City Council are responsible for destroying our original tram network in the 1950s, for destroying about 100 miles of our urban rail network in the 1960s and building roads, offices, houses and trading estates on about 50 miles of former railway line.  There remains 78 Km that the transport authorities refuse to re-open for passenger trains.

78 Km of double track rail lines, some literally alongside roads with bumper to bumper traffic is complete idiocy.  But, this stupid transport policy has gone on for 50 years!

These sincere and well-meaning politicians and officers also demolished not one but two of our magnificent Victorian rail stations.  A third remains standing.  This is Moor Street Station, the closest to Grand Central but it was overlooked for connection to Grand Central in favour of the further away, Snow Hill Station.  Every train that stops at Snow Hill also stops at Moor Street.  Yet, another blunder, Snow Hill was chosen and Moor Street will never get its £100 million per mile (for construction costs) tram!

After 34 years of wasted endeavour to get Midland Metro, some rail lines remain unused and waiting for electric trams that never arrive.  The network of 15 tramlines and 200 Km by the year 2000, never arrived.  They were never delivered in that year or, even fifteen years on!

Grand Central Shopping Centre and station - the station tagged along as an afterthought and shoved in the basement of the John Lewis store - remains one of the UK's worst rail and road congestion bottlenecks.  So much for £750 million of railway money that is mostly wasted!

Please correct me, if I am wrong in any detail, above.  If no-one puts me right, I will assume that my information, here remains accurate.

Monday, 16 November 2015

Love empty but available rail lines; hate their waste, their disuse, their lying idle!

Reflections after my first Railfuture conference
This was an excellent and well organised conference with a range of interesting speakers who all held my attention.  This was easily good enough for the professionals to attend, of whom we did have James Freeman of FirstBus and Matthew Golton of GWR who spoke and, stayed for the whole day.  They are a credit to their profession and I give both 10 out of 10!  More of their colleagues from around the UK should have attended and could have learnt so much from what they are doing, in my opinion.  Now for something different.


To make it less tedious to read, these are my jaundiced and bolshy views about the English rail industry and their transport planners - and, put in bullet points because my stuff and nonsense, I am convinced, never ever gets read, because nothing ever changes!  The professionals, on very good salaries, are making far too many mistakes, from what I can gather.  Here goes:-

  • 15 tram lines, covering 200 miles by the year 2000 as the professionals predicted were never delivered.  After 34 years, only the one line has still to be completed to Birmingham Grand Central!
  • 38 Km unused, strategic and nationally important double track rail line, called the Black Country Line, for 50 years without passenger trains - only some freight for 6 Km!
  • Next door, 57 Km in Birmingham of double track rail lines with their stations demolished and no passenger service - for 50 years!
  • Yet, 160 Km to Birmingham of HS2 at £50 billion of brand new, greenfield, super fast rail lines are essential said Toby top man Rackliff of the (gone)West Midlands (dis)Integrated Transport Authority.  Essential in order to release capacity on the rail network.  But 38 plus 57 Kms are already released and available now to take passenger trains in the Black Country and Brum!
  • Today, in Bristol, some of the nation’s most enthusiastic railway campaigners were not at all put out by being told this.  It seemed to be a thoroughly normal state of affairs for every single one!  Neither Toby top professional Rackliff (when I saw him on the 15 October in Centro House) nor the 130 Railfuture rail enthusiasts, today were at all impressed with unused or underused rail lines in a heavily road and rail congested, urban conurbation.
  • No-one was bothered that, on the 38 Km, a fully operational rail line of freight or trams must be done FIRST before stations are rebuilt and the re-introduction of possibly only a shuttle passenger service can be achieved (so says very top Transport Officer, Laura Shoaf in September 2015 and Passenger Services Director, Tom Magrath in 2000)
  • Both the professional and amateur rail enthusiasts seem to want new trains on new lines but not new (or old) trains on existing urban (partly used) rail lines literally alongside or very near to commuter congested roads in the heart of the densely populated Black Country.
  • They think that HS2 and HS3 should have been built 20 or 30 years ago (GWR Commercial Development Director, Matthew Golton) but are not at all bothered that today urban rail lines are used for freight but not for passenger trains - as was the case for 100 years!
  • Should not electrification have been completed first, 20 or 30 years ago?
  • The professional and amateurs think it is lovely for the Swiss to have electrified their rail network in only two decades, 70 years ago but believe it is quite normal for the hopeless but so brave, battling around the Middle East, Brits to be still at it after five decades and, still, nowhere near being completed!
  • Goodness me!  You can’t have one rail project completed before you go on to the next.
  • Never allow the successful 100 year old passenger service to return to the freight lines but let them stew and steam in their cars in bumper to bumper traffic alongside the lines!
  • President of Railfuture, Christian Wolmar said that there is a rocky road ahead for rail in the coming years but failed to say that this will never be the case for HS2 or HS3 and, certainly, never the case for Crossrail 2 because that is in London!
  • The 40 mins service on the short Walsall to Wolverhampton rail service was a dismal failure last decade but a 20 mins turn up and go will attract the punters, says (no)Railfuture (their top rail re-opening)!
  • Is this, Railfuture being over ambitious in wanting a turn up and go on the 8 Km line or lacking in ambition in not wanting the really useful, SW to NE cross country trains and commuter service between the 38 Km of Stourbridge and Lichfield?
  • Smart Motorways and, now, high speed and underground rail lines must be built before returning the trains and stations to the most important and easily available rail line that could be opened in all the UK.
  • This is the strategic, 38 Km Black Country Rail Line that goes through the heart of a densely populated urban conurbation.
  • New housing estates are going up next to the line but the proud owners must jump in their motors but never walk/cycle or bus to the train station because it will never be re-built!
  • Ah!  But that is where you are wrong, Tim.  Laura says it will be in the 2040s, at the earliest!
  • How very strange that neither the professionals nor the amateurs have it as their top priority.
  • Cross Country Trains should be clamouring for this rail line to be re-opened, double quick.  It would give them a new rail path to bypass Birmingham Grand Central and the competition  between the tocs for the paths there.
  • It would grow their business and boost their profits when the passengers are there for the taking.
  • It would help them to be given the next franchise.
  • How very peculiar that having spent £¾ billion on Grand Central Shopping Centre and basement station to improve the passenger (shopping) experience but never the train congestion there, the professionals and the amateurs still don’t get how the Black Country Line could help reduce the very grandest rail and road congestion bottlenecks in the UK - the ever so shiny and mirror-like Grand Central!
  • How very strange that for all of them, their tops for a Beeching reversal was the £10 million per mile, partly single track rail line through the heart of beautiful, rural, depopulated southern Scotland to the middle of nowhere.  Well, had you heard of Tweedbank?
  • The actual top priority for the West Midlands professional and amateurs is the £100 million per mile tram extension through pedestrianised shopping streets in Birmingham city centre, when bio or electric buses would be more sensible.
  • How very strange that both the professional and the amateur experts want Light Rail, or Very Light Rail or the tram-train or the Parry People Mover on the nation’s most important and strategic, national rail line.  Never good ol’, ordinary diesel or electric trains for passengers to use instead of their cars.  Ghost trains, perhaps!
  • Never, ever learn from what our forebears did with rail lines.  They used them for trains.  Today, we confuse ourselves, love to complicate matters and most definitely waste our taxes on not using them for passenger trains.  Sometimes for freight and, in the past, for roads and, as an interesting innovation, even for offices, hotels and homes to run down them!
  • All your eggs in one basket transport policy of always cars and buildings on urban rail lines and, now in the case of the Black Country Line, carbon capturing trees and shrubs but never trains.  So what?  Whatever next?  Climate catastrophe in a fast warming world?  We better get more trees on urban rail lines.  Double quick.
  • Love empty but available rail lines; hate their waste, their disuse, their lying idle!

Thursday, 5 November 2015

Railfuture is also 'wowed' by the basement station that is the Grand Central Shopping Centre, Birmingham

Dear Lloyd

I have just read Michael Tombs glowing report on the redeveloped Birmingham station that he so approves of.  Here is another point of view.  Please could you forward this to Michael for his comment:-

36 escalators, Michael wrote but, are there any stairs from platforms to concourse?  Surely, there must be!

Bullring Shopping Centre was opened in 2003.  With rising rail passenger numbers throughout the 1990s and continuing to this day, the authorities should have realised that additional tunnels were needed at the eastern approach to Grand Central basement station, then.  The new rail tunnels could have gone in after the demolition of the old Bull Ring and before the shops and stores were built for the new Bullring Shopping Centre.

£750 million of railway money for what is, mainly, yet another brand new shopping centre is a misappropriation of public money.  In other words, corruption.  From the BBC, I heard that Grand Central is likely to be sold to the owners of the Bullring and, Birmingham City Council will profit, as a result.  It will profit from the misappropriation of railway money when, like yourselves, they were also partly responsible for the blunder of failing to build the new rail tunnels in the 1990s.  This, when for years there had been much talk (but never any action, of course) of building an underground railway in Brum!

Both the railway industry, the DfT and Brum City Council are responsible for destroying our original tram network in the 1950s, for destroying about 100 miles of our urban rail network in the 1960s and building roads, offices, houses and trading estates on about 50 miles of former railway line.  There remains 78 Km that the transport authorities refuse to re-open for passenger trains.

78 Km of double track rail lines, some literally alongside roads with bumper to bumper traffic is complete idiocy.  But, this stupid transport policy has gone on for 50 years!

These sincere and well-meaning politicians and officers also demolished not one but two of our magnificent Victorian rail stations.  A third remains standing.  This is Moor Street Station, the closest to Grand Central but it was overlooked for connection to Grand Central in favour of the further away, Snow Hill Station.  Every train that stops at Snow Hill also stops at Moor Street.  Yet, in another blunder, Snow Hill was chosen and Moor Street will never get its £100 million per mile (for construction costs) tram!

After 34 years of wasted endeavour to get Midland Metro, some rail lines remain unused and waiting for electric trams that never arrive, let alone the once popular passenger trains!  The network of 15 tramlines and 200 Km by the year 2000, never arrived.  They were never delivered in that year or, even fifteen years on!

Grand Central Shopping Centre and station - the station tagged along as an afterthought and shoved in the basement of the John Lewis store - remains one of the UK's worst rail and road congestion bottlenecks.  So much for £750 million of railway money that is mostly wasted!

Please correct me, if I am wrong in any detail, above.  If no-one puts me right, I will assume that my information, here remains accurate.