Thursday, 5 August 2021

Train spotters who never spotted that their beloved railways were being destroyed!

Good morning, Mark and, in the FoE corner, Bill, Gerald, John, David and Chris - friends over the years who are welcome to comment, please!

Thanks for this Mark.  I am disappointed by the railway industry and Railfuture that is out to grow their business with projects like Crossrail 2 and HS2 that will spew yet more greenhouse gases into the atmosphere to worsen our prospects because, all the spending, adds to the runaway greenhouse effect and the planet's Sixth Mass Extinction episode (our own).  Happy days!

At the same time, they have spent the years since 1945 closing railway lines as we went out to buy and use cars with ever greater enthusiasm but, then, being content with seeing their own closed railway lines destroyed without a murmur of protest, let alone the vigorous (fairly vigorous, along with much else) campaign that I have indulged in since the mid-90s!

The railway industry and Railfuture have also supported the light rail, tram industry taking over heavy rail lines to further add to the loss of capacity on our railway network!

The railway enthusiasts, yet again, have started to destroy a perfectly good railway line - the Black Country Mainline through Dudley, Sandwell and Walsall.  The six other railway lines in Dudley, alone are already gone for ever but, then, they want HS2 as a greenfield railway only a little less damaging than a greenfield motorway.  However, colossally more expensive than motorway building!  Over £200 m/Km for HS2; £21 m/Km for M6 Toll when it opened in Dec 2003.

What do you make of that, Mark, David, Chris, et al?  Is my reasoning right, do you think?

Friday, 8 January 2021

A shocking waste of resources to replace buses and trains

THIS IS THE SCALE OF THE SCANDAL and, another nail in our (homo sapiens) coffin:

£7 m/Km for the rebuilt, 50 Km Borders Railway in Sept 2015 - public money

£21 m/Km for the 43 Kms M6 Toll in Dec 2003 - all private money

£75 m/Km for the Broad St Metro extension in 2021: now worse for bussing in

£133 m/Km for the Brum Eastside Metro extension in 2023- public money

over £200 m/Km for HS2 - all public money

HALF A BILLION (for trams) TO BREAK UP the UK's last mainline railway, half-finished, virtually ready built but only half used, 120 Kms Worcester, Black Country, Derby railway.

A further 50 Kms in the W Mids, alone, are still waiting for their passenger trains to be returned.

Thanks for writing, Owen.  Good points.  I do have a life to live and I have been suggesting that the railway industry should finish electrification throughout all my long life.  However, I'm such a successful failure that, instead, they have completely misunderstood and, run homes, shops, offices and roads down them!

Monday, 12 October 2020

Is 'Restoring Your Railways' too revolutionary and 19th century?!

 I am asking, along with the Green Party, if Left Unity and your good self could strongly support the drive for 'Restoring Your Railways'.  This is an HMG/DfT, UK-wide initiative but is only very half-hearted with a small amount of money allocated for a few feasibility studies and, nothing at all for the completion of the nearly ready-built, 120 Kms (74 miles) Black Country Railway between Worcester and Derby via Dudley, Sandwell and Walsall.  It bypasses Birmingham that is exactly what Brum needs with its congested, over-loaded, 'Grand Central Shopping Centre and Diesel Perfumed Underground Station In The Basement Of The John Lewis Store'.  A rather over-loaded name, too!

Network Rail and the DfT both agree that it is a railway "of national strategic significance"​
​​Metro trams are now being built on 6.7 Kms in the middle of the unused, wasted 56 Kms that is also without the trains and stations.  This leaves 49.3 Kms that is unused on either side of the Wednesbury to Brierley Hill Metro tram line, when every underpass and bridge for M5/M6 and M6 Toll and every road and canal is already built for TRAINS!​

F​irst of all, does this have your personal support, Bob for the completion of what may well be the world's first train-tram-train mainline railway with two changes from train to tram at Brierley Hill​ ​and back to train​ ​at Wednesbury?

Does it have your personal support for commuter and regional trains between Stourbridge and Brierley Hill and between Wednesbury and Burton on Trent, instead of more tram extensions, bus rides and even an extended cycle-walkway on an existing double track mainline railway between Walsall and Lichfield?

Would the regional and national Left Unity ever be able to agree to the TRAINS AND STATIONS going back on this existing double-track mainline railway?

Would the regional and national Left Unity ever be able to agree that COMMUTER TRAINS AND STATIONS should return to existing, not yet destroyed, railway lines in heavily congested urban conurbations like the West Midlands?  There are 106 Kms, minus the 6.7 Kms going for trams, that are freight only or mothballed for trams and cycles.

What is your honest opinion of what seems to me the blindingly obvious thing to do to reduce congestion, air pollution and rising, deadly greenhouse gases?

With all my e-mails, phone calls and speaking since the 1990s, I feel I have won a major success that the authorities are now thinking about​ ​(and even a little action) ​over ​"Restoring Your Railways"!

This is also an easy WIN for Left Unity to send us on our way!  It is being positive, constructive and helpful.

Or, is it a far too revolutionary a concept?  And it is me that is eccentric, a loony leftie and completely out of my little mind?

Best wishes

​Tim​

Sunday, 2 February 2020

Criticisms answered

Hi David
from:
"To mark the start of the tramway, the Mayor and Cllr Harley joined workers building a £4.33m wall at Castle Hill, which is the first physical structure of the project.  This is £4 m out of £449.5 m, plus inevitable cost overruns for the tram extension.  There is still time to point out that the tram blocks, it spoils the integrity of the full line from being used through the Black Country WITHOUT CHANGES between other modes.  The Black Country is a similar population to Brum but is very much overlooked; it is in the shadow and very much the poor relation of Brum.  Especially, rundown Dudley High Town where the tram is planned to go.  It's thriving Low Town is Castle Gate and that is exactly where the only feasible site for the Dudley Castle Gate railway station is and where the £4 m wall is being built.  A railway station is far more sensible than a tram stop for a piddling little shuttle tram line of 6 Kms that still leaves 50 Kms wasted!
"The wall is currently being built with money from a grant agreement funded from the WMCA with completion expected this summer.  The wall is part of the preparatory works.  Main works start next year, it now seems but, that may well change as it has done so many times.
"When it opens to passengers in 2023, the Metro extension from Wednesbury to Brierley Hill will offer people vastly improved transport links with up to 17 stops including Dudley Town Centre."  17 stops means the "bus on rails" (UK Tram Ltd) tram stops even more frequently than the bus that goes directly on the road, without tracks having to be laid first!  Keep the bus between Wednesbury and Merry Hill and use the mainline railway over all 120 Kms for commuter, regional and intercity trains.
Your email: "partly your fault about RailFuture as you were  unable to persuade them abut the 56 Kms Stourbridge Jct to Burton on Trent on the ready built, but only half used, 120 Kms Worcester to Derby principal mainline railway:
You need to learn how to persuade people, not hectoring them and calling them idiots.  I hope I have never called individuals 'idiots'; only their strange behaviour as idiocy or idiotic.  I have been an idiot when cycling or mountain walking at times but, never causing even more road and railway congestion and yet more greenhouse gases, as they have done and are still doing with destroying and wasting railway lines.  In fact, the full time professional transport experts wanting "bus on rails" trams instead of trains on mainline railways are the very ones who call me "an idiot" and behind my back, I've been told!
You have not answered my question about why so many european countries use Trams ? Are they all stupid too?  No.  However, there is no doubt that with hindsight, we now know that the money gone into highly expensive tram construction could have been used for reopening railway lines (like Snow Hill to Wolverhampton Low Level) and for electric buses with free fares for all and not just old crocks like me.  Tram line construction last decade was three times more expensive per Km than building the green field M6 Toll that opened in the previous decade (Dec 2003).  London and other places had electric buses with lead acid batteries in the early 1900s, according to 'A Most Deliberate Swindle' by Mick Hamer, pub 2017.
Trams are a half way house between trains and buses. They are expensive, but provide a clean and efficient way of moving people. Have you been on the WM Tram ?"  I love to use trams, David.  My wife and I have used them in Europe and we like them.  I use the Midland Metro, even on the latest extension to the library, and have never had to pay for the last twelve years because of my advanced years.  I don't love the very hard plastic seats that look so soft, comfortable and inviting as though you can gently sink into them.  You get a rude awakening!  I can even cycle alongside the Metro One line and have often done so since 1999 and, well before the tram works started in 1995 or '96.
BACK TO BLACK:
Manchester and many European places have successful "bus on rails" tram networks that are all brilliant.  But this does not deny my point that the many billions of pounds and euros that have been spent could have gone to give everyone free fare, electric bus rides without the disruption and expense of rail tracks, first.  And that would have been much more effective in relieving road congestion and air pollution; as well as pumping out fewer global warming greenhouse gases.  Do you agree, David?

I know the trams are coming to Dudley but TfWM/WMCA are still promising the trains too.  We now, David have to encourage them to put the commuter and regional trains back on the full length to finish the 120 Kms.  It can still be intercity trains as we had for 100 years.  Certainly, regional and commuter trains with two changes for the tram to make progress along the full length of the line.  Will you help me, please?

Thanks for writing.  Please keep in contact and keep telling me where I am going wrong.  It is really good of you to show an interest.  You are almost the only one!!  But Andy Street is on board for trains to return, everywhere, except where he is told they must be trams, as in the Black Country!  We have to support him, as I am doing; publicly, too at his meetings.  But not over HS2.

All the best.  See my photos, below.

Tim 
--
MY TWO FAVOURITE PHOTOS of all time - the oversight was described by one person as 'bizarre'; another called it 'bonkers'.
Wasted 56 Kms Stourbridge Jct to Burton on Trent on the ready built, but only half used, 120 Kms Worcester to Derby principal mainline railway:

MISSION STATEMENT
Burton to Bristol via Brierley Hill; Derby to Devon via Dudley - by TRAIN not "bus on rails" trams as they are wanting, plus new extended cycle-walkway!

Thursday, 19 December 2019

6 CHANGES ON MAINLINE RAILWAY when none should be needed!

Dear Anthea McIntyre, Rupert Lowe, Andrew England Kerr, Martin Daubney, Ellie Chowns, Phil Bennion and Neena Gill CBE,

Since the 1990s, when I was told by Roy Burgess of the existence of the half used, half empty, principal mainline railway through the historic capital of the Black Country, every political party has never wanted our own railway line finished with TRAINS!

In fact, since the 1980s, your party has always wanted Metro trams on the 6.7 Kms out of the unused 56 Kms to make it impossible for the commuter, regional and intercity TRAINS to return on the full 120 Kms between Worcester, the Black Country and Derby.

HERE, BELOW IS THE ABSURDITY YOU STILL ALL SUPPORT!  Is this the most challenging and slowest train journey in the world?

Going by train, from Worcester to Derby, on one, EXISTING, mainline railway, the politicians and transport experts want:
Change at Stourbridge Jct for the Very Light Rail Stourbridge Shuttle to Brierley Hill (one option).
Change at Brierley Hill for Light Rail Metro tram to Wednesbury.
Change at Wednesbury for the bus to Walsall.  Eventually, a tram, a train or a tram train may be available.
Change at Walsall to hire a bike for the current cycle-walkway being extended, by volunteers, to Lichfield City Railway station.
Change at Lichfield for the train.  Passenger trains are forbidden, so you have to go SE, the wrong direction, to Tamworth!
Change at Tamworth to go in the right direction, NW to Burton on Trent and Derby.

END OF JOURNEY with six changes when none is needed with my plan!

This is so typical of backward, behind the times, we are the greatest, Great Brexit Britain.

PHOTOS:



Have a wonderful Christmas of reflection and then sensible action  - PLEASE!

Tim    (Weller)

Monday, 22 April 2019

Isn't it funny. Every business case ...

is called robust;
robustly justifies every kind of expenditure from spending £1 billion of public money on 14 Kms of tramline to duplicate a bus route in 2014;
to spending nearly the same but, this time, private money on the M6 Toll for 43 Kms in 2003;
to splashing out £17.6 billion of public money on 117 Kms Crossrail;
to justify spending £44,000 per metre to extend your £1 billion tram line to replace buses;
to justify spending £44,000 per metre to convert our ready made, but they forgot the trains and stations, 120 Kms mainline "of national strategic significance" into a piddling shuttle tram line on two short, middle sections, totalling 6.7 Kms.

All this, when there is never a business case to slash public spending on the Police, the NHS/social care or education to pay for all this largesse.

The money is always found for the flash, the glamorous, the most prestigious projects to hasten Attenborough's "collapse of civilisations" and "the extinction of much of the natural world" warnings from the COP24 in Poland in December 2018.

Are you good Scots getting in on the English act?  Don't follow the English way of the most perverse spending priorities and isolationism!

GLORIOUS ENGLISH ECCENTRICITY: the UK's only mothballed, easily reinstated, ready made but they forgot the trains and stations, mainline railway!

WHICH IS MORE SENSIBLE THINKING?
2 or 3 fast regional trains every hour and nine new stations to complete the
120 Kms between Worcester and Derby;  OR: 6 to 10 "bus on rails" trams every hour and 17 tram stops over only 11 Kms to STOP the reinstatement of the railway "of national strategic significance."

SMART POLITICIANS?
£449 m plus cost overruns to build the Black Country Tramline over 6.7 Kms that destroys the Black Country Railway over 56 Kms.  All 56 Kms can get commuter/regional trains back for less than £200 m (2015 figure).  Or, stupid politicians?

SMART RAILWAYS?
Why CUT a 120 Kms principal, mainline railway through the congested West Midlands with a tramline in two halves, a railway test track and a trail of trees, Japanese knotweed and undergrowth, when absent trains on 56 Kms of track could have their trains and stations back, FOR LESS MONEY than using trams on only 6.7 Kms?

Monday, 23 October 2017

Both sides argue it out here

Managing Editor, 'Railnews', Sim Harris in the black corner; Tim Weller in the blue corner

Tim – you have missed the point.  From other railway passengers I have spoken to, I seem to have raised a most pertinent point.  Millions of pounds spent on a half completed, 120 Kms mainline railway that is about to be further broken up into a 2 Kms test track, a 6.7 Kms tram line in two halves, a trail of trees, Himalayan Balsam and undergrowth and, a cycle-walkway!  Thus, many millions wasted that was spent on the bridges and tunnels to cross two motorways and three dual carriageways but , even so, STILL NO TRAINS, NOT EVEN FREIGHT TRAINS on 30 Kms, anywhere near these major congested roads!  Your side, Sim has forgotten to put the regional and national trains back.  How foolish and irresponsible is this as we all sit in bumper to bumper traffic and, on overcrowded trains?  Regrettably, it must be called incompetence and financial illiteracy to describe such absurdity.
If I think we risk endorsing your views, then that’s the ruling. Not your call.  I was simply wanting the opinion/feedback of readers, since they were most welcome from your good self.  I also need others to influence my thinking - and, to put me right.

Actually, could you please cease your campaign now?
It must be plain to you that no one else is interested, and I am including all the hapless recipients of your recent message in this reply, because I am sure they would appreciate an end to this too.  In fact, 183 people are most interested, Sim!  183 supporters, sympathisers and activists:​

I "would appreciate an end to this."  I would appreciate an end to the railway industry standing meekly by as their infrastructure gets wasted and even destroyed for homes, roads, trading estates and, for rather a lot of retail therapy!  £0.75 billion, in fact, for our lengthy named but quite magnificent 'Grand Central Shopping Centre and Diesel Perfumed Station Tagged Along as an Afterthought in the Basement of the John Lewis Store'!

£0.75 billion "to enhance the passenger experience" for shopping, as I was told by David Golding of Network Rail in 2015!

Homebase built on Kings Heath railway station, too, with occasional trains to and from Bristol sweeping by but, mainly freight!  The line is parallel to, and alongside, bumper to bumper traffic on the main radial road into Brum city centre from the M42.

I am now going to try – for one last time – to point out why this campaign is going nowhere.  The campaign has had the full support of Mayor Andy Street who is now to put the passenger trains back on the 39 Kms of freight only railway lines in Brum.  This is certainly his intention.  I hope he succeeds.  I have spoken to him, he has listened and he sees the sense of railway trains on perfectly good, existing railway lines.  We are both on the same side.  Please come on board, too, Sim.
There are two potential reasons for restoring a direct rail route between Derby and Worcester via Dudley.
There are two main reasons, as I and my supporters see it.  A former Railfuture committee member put it to me like this.  "Derby to DEVON via Dudley and Burton to Bristol via Brierley Hill."  Rising demand for railway trains as our roads and motorways get clogged up.  More than a doubling of passenger numbers since privatisation.  Yet, a principal mainline railway between London and Scotland remains broken, wasted but available for commuter and fast trains over 56 Kms in a heavily congested and populated urban conurbation with clogged motorways as bad as the M25.

The second main reason is to take the pressure off train congested 'Grand Central Shopping Centre ... '  BBC Midlands Today transport and business correspondent has called Brum's mainline station  "one of the worst rail congestion bottlenecks in the UK".  Birmingham is such a greedy honeypot, they want all trains to go via their building site of a city.  Why not spread out the largesse and help the Black Country grow economically so that our four boroughs are less of a backwater?

As regards population, the Black Country is larger than Brum, according to Wikipedia.  One newspaper reporter wrote that Dudley is the largest town in the UK without a railway station.  The site is about to be lost for ever for an innovation and engineering centre to built there!  How stupid is that, Sim?

A third reason is that even the Ordnance Survey think our mainline railway is in use between Stourbridge and Walsall.  See their current maps here:​
​
One is demand for through or regional journeys – Dudley to Derby, say. Derby to Dudley to Devon, please. The other is demand for local journeys.  Exactly, because this forgotten, this unique, this unused, this wasted railway can fit that requirement, too.
As for the first, there seems precious little likelihood that there is much demand in Derby for a through train to Dudley, or anywhere else in the Black Country. Through rail passengers between Derby and Worcester can complete the journey in 1h40 with a single change at New Street. Why will you not let them, Sim have their journey in less than 1 hr 30 mins by going direct via the Black Country, without needing to change?  And, in the process, reducing a little of the train congestion at Grand Central.  Why does every passenger have to travel via Birmingham and never the direct route through the Black Country?  There are other connections available which route passengers via Snow Hill and New Street, and these journeys take just over two hours. Together, these trains offer a 30min frequency, which seems adequate.  Certainly NOT adequate with economic growth, population growth, road growth and the growth in railway travel in the Black Country and Brum.
As for local journeys, the closed line skirts the West Midlands conurbation, and would not offer any new links towards Birmingham city centre – unlike the trams.  The wasted, the forgotten Black Country Railway does NOT skirt the W Midlands conurbation, Sim.  It goes through the middle of three Black Country boroughs, exactly where our infamously M25 like, congested, M5/M6 runs.  The Borders Railway goes through the middle of nowhere, the beautiful Southern Uplands but, is still popular and successful.  The Black Country Railway would be even more so if the middle section was finished with the trains (NOT trams) and with stations (NOT tram stops) and NOT a test track or linear woodland - please!!

The Black Country Railway offers a local commuter service via Stourbridge and the Black Country through Bescot into Snow Hill station with its still wasted, unused platform 4.  It is 50% longer than the present Jewellery Line but, with four station stops, should take the same length of time but with Birmingham city workers getting a seat instead of too many, now being treated like sardines.

A wasted platform 4 because the tram used it until the tram bypassed the station to go to Grand Central Shopping Centre, instead.  This was the tram that left 3 Kms of double track railway line wasted in Wolverhampton (now destroyed) and led to the demolition of Wolverhampton's second mainline station.  There is now NO tram stop at Snow Hill station.  The business case must have lied, for the main reason the money was given was to connect Snow Hill with Grand Central Shopping Centre.  The nearest tram stop is Bull Street, a walk of 300 metres to the station platforms.

I am sure that Mayor ANDY STREET understands the value of a second, quick TRAIN commuter route with the double tracks already there in the Enterprise Zone that is DY5, in Brierley Hill.  It goes through Dudley and Sandwell to Snow Hill.  Under the latest plan, with the grossly extravagant tram (£30 m/Km + £2.5 m for each tram), people from Stourbridge Jct would have to change at Harts Hill for the tram that stops on average every 650 metres on the UK's only unused, easily reinstated mainline railway that we are then promised (actually lied to) will also have fast trains and freight trains.  Some, perhaps all, tram passengers would also have to change at Wednesbury to get by tram to Brum.  Finishing the 120 Km railway line by putting TRAINS on it would give a faster, direct, train commuter route into Birmingham.  Obviously, more sensible, Sim, don't you think?
There is undoubtedly peripheral commuter traffic within the Black Country, between Dudley Port and Wednesbury, say, and some commuters might be willing to transfer to rail-based public transport. They are going to have the opportunity when the new Midland Metro line opens. Incidentally, the trams will serve Dudley town centre, unlike the heavy rail line, which implies that trains would be less likely to attract commuters travelling to and from Dudley.  It is most inappropriate for a flash, glitz and glam, £2.5 million tram at £30 m/Km, should be seen running through a rundown Dudley town centre with its two huge, empty office blocks, one with every window smashed and a town centre without a department store.  There is no reason for us Dudley folk to visit our town centre.  We all go to Merry Hill for excellent shops, stores and leisure attractions.  There are more attractions where the former mainline station stood, at the foot of Castle Hill (four major tourist/leisure attractions) and at Dudley Castle Gate that is on the other side of the railway station from the tourist/leisure attractions.  But the mainline station site is to get a suite of buildings for the innovation centre that would be more sensibly placed by the 3 Kms branch line at Brierley Hill that can be used for the test track.  Thus, our 4th (the other 3 were not mainline) Dudley railway line gets obliterated by this one foolish decision and the whole 120 Kms is nicely severed at Dudley Castle Hill!

You have told me (many times) that we are discussing 56km of route. At present costs, restoring it as non-electrified heavy rail seems unlikely to come in at much under £500m.  But, Sim it was your own excellent 'Railnews' that told me, in 2015, that the REBUILT Borders Railway was £294 m for 49 Kms of diesel locos and mainly single track.  That works out at £6 m/Km.  Ours is double track but many millions of pounds have been spent on every single structure except for Parkhead Viaduct that simply needs strengthening for £10 million (as I was told by West Midlands Rail expert, Toby Rackcliffe in November 2014).  Out of the 56 Kms, 26 Kms already has freight trains.  That leaves 30 Kms at £6 m/Km = £180 million.  Your £500 m is wrong, Sim.

Chris Grayling is going to give them £207 m, as his contribution, for only 11 Kms of trams.  That is more than enough to finish the 120 Km principal, mainline railway.  Your wish for "bus on rails" trams will prevent FOR EVER the completion of the mainline railway to bypass congestion bottleneck Brum and to bring some economic growth to the Black Country.  Yet, the authorities are telling us that "light rail investment provides the basis for restoring heavy rail services at the appropriate time." (letter to me dated 18 September 2000)  Such stupidity must be unheard of anywhere else in the world!
The rebuilt section of the Borders Railway was almost as long – 50km – and the final construction cost was around £300m. But that was at 2012 prices, and part of the route is single track (unfortunately). One of your 2015 issues, when the line was soon to be opened, said it cost £294 million for 49 Kms.  Even so, the Borders line has done very well, and has demolished the ‘white elephant’ argument which was used by its opponents.  For £300 million, three major structures had to be built.  ALL have already been built for the Black Country Railway - the most recent over the M6 Toll in 2003.  Yet, still, only phantom trains.
But the BR has been built through a largely rural area where there had been no rail-based public transport available for many years, and provides a direct link to the centre of Edinburgh, which has proved attractive to commuters as well as tourists and other leisure travellers.  I have driven on the parallel A7.  The only bumper to bumper traffic I have ever seen was at traffic lights on red.
So the core question is this. Reopen your 56km of railway between Stourbridge and Burton, and restore a through route between Derby and Worcester in the process. Where is the longer-distance regional traffic to come from? What is the more localised demand that trams cannot satisfy? In particular, as you rightly say, the line bypasses Birmingham, which I suspect planners would see as another weakness.  The fact that it bypasses Brum is its greatest strength and help to that city, Sim!
I also suspect any attempt to establish a business case (vital – not a luxury) would founder very quickly on points such as this, which is perhaps why no one seems willing to fund one.

We have had vital business cases written to justify that this principal railway line should be given bridges and tunnels to soar over or under the M6, M6 Toll, A452, A5 and the Black Country New Road.  These robust, verifiable and clear business cases were written and cost huge sums of money.  Yet, such was the worthlessness of the business cases, that the huge expense argued for never included a single train or station.  Yet, the structures were still built.  This is utter madness!!
​​​​
Strong as steel business cases written to justify the part building of railway lines without a single train.  What a joke!  
Robust business cases to justify any expense that  the extravagant authorities want at a time of austerity for the rest of us.
Irrefutable business cases to justify £75,000 per metre for the new tram to Edgbaston from Grand Central when an electric bus could do the job just as well for a tiny fraction of the price.  Diesel buses already do, from only slightly further away!
The ever so competent (I don't think) business case for Metro One in the 1990s justified the closure of three Kms of double track railway line in Wolverhampton, the demolition of Low Level station and the failure to even bring the tram to the bus station, let alone the railway station.  The business case never conceded that restoring the train service would have avoided all of that idiocy and, at a fraction of the price, too.
The latest business case for the Black Country tramway on the Black Country Railway is no better.  It justifies 6.7 Kms for "bus on rails" trams, leaving 49.3 Kms of railway infrastructure, costing millions of pounds, for trees and Himalayan Balsam, a test track and a cycle-walkway.  This is absurd.
An expert business case that argues for the return of main line services of freight, commuter and intercity trains on the one set of double tracks to complete the 120 Kms Black Country Railway BUT, FIRST, a middle 6.7 Kms section has to be given over to trams stopping, on average, every 650 metres and with a frequency of 6 mins at peak times.  This is totally unacceptable.

Unlike in my September 2000 letter from Centro, I think they must have only meant tram trains in recent years.
And, tram trains that must stop almost as frequently as buses are inappropriate for a 120 Kms railway between London and Scotland.  In Germany, tram trains I believe, don’t cover any greater distance than 20 Kms.  We are to get 12 Kms and 14 tram stops between Sheffield Cathedral and Rotherham Parkgate for the still being developed tram train, when they have already been developed in Germany.  And, so far, it is five times over budget and is way behind schedule!

I am embarrassed and ashamed to be British and for my country to be a laughing stock, like this.
You point to congested roads in the area, but restoring trains would only ease that problem if the diverted motorists are making journeys which a reopened Burton-Stourbridge railway would offer.  Of course, they are making car journeys from the many new settlements that have sprung up next to or near the forgotten main line.  What about all the car journeys going to the greatly expanded National Memorial Arboretum at Alrewas, Sim?  Why must there never be a station there?
I suspect that a great many of the road journeys are local (the school run, as well as short-distance commuters and shoppers) and the people making them would not be attracted to trains – at least, not along that corridor. Trams, however, are set to relieve some of the pressure because the alignment of the route from Brierley Hill towards central Birmingham and also Wolverhampton really could get some people out of their cars (as has happened in Manchester and other places with restored trams).  The railway line goes to central Brum, Sim.  And, without changing - anywhere.  Build the Benson chord in exactly the way Birmingham FoE suggested in their document last decade.  It really is shocking that complete amateurs have to tell the authorities their job.
I am not going so far as to argue that no-one would use the reopened line, but a decision to spend £500m+ would have to rest on very much firmer ground than any argument you have been able to offer.  Less than £200 million, at the 2015 price for Borders Railway, when so much work has already been done for the Black Country Railway.  £200 m would include the nine stations built over the 30 Kms, as Railfuture wants.
One final point. This is cannot be the springboard to a new discussion and, indeed, I fear I cannot undertake to respond to further correspondence, because I do have a paper to get out.  I quite understand.  But, please stand up for your industry, Sim.
I really hope you find something more rewarding to occupy you soon.  This sad saga reflects so badly on the railway industry and the transport bosses.  My 183 supporters/sympathisers and I should not have to remind them of their duties!  I exclude, ANDY STREET, who is relatively new to the game and is saying all the right things about getting the trains back and the stations built.  Chris Grayling is also saying many of the right things.  See:​

​
Best wishes    Tim

Yours, etc.
Sim Harris
Managing Editor
Railnews
Today's news for tomorrow's railway
t +44 [0]7950 533703
e sim@railnews.co.uk

Tuesday, 1 March 2016

Corrupt transport practices

This is a scandal, a disgrace and has gone on for decades.
  • 78 Km of unused or goods only, double track rail lines alongside/near congested roads in the Black Country and Birmingham.
  • Further 58 Km from Walsall to Derby via Lichfield is still not available for passenger trains.
  • 2 important rail curves still not built - after 50 years.
  • £750 m (all rail money?) for Grand Central Shopping Centre with the main line station tagged along as an afterthought and stuck in the basement.
  • Now, plan for transport money going for subsidising M6 Toll to further reduce the amount of money for urban Beeching rail reversals in the Black Country and Brum.
  • The W Midlands Combined Authority remains corruptly biased towards road schemes; secondly, towards super expensive tram extensions in Birmingham city centre; thirdly, £12 m for a second rapid transit mode to duplicate the first, trams. What little money is left over may then go to Brum rail schemes 
  • Beeching rail reversals continue to be sidelined in the Midlands.
YOU ONLY GET WHAT YOU ASK FOR!

THANKS to all those who saw the forgotten railway on Sunday, 21 Feb.  We are forbidden, even after 50 years, to have our trains back.  Don't stand for it!

If you think that every mile should be available for us to travel on by diesel train (in the first instance) and from Stourbridge to Walsall (later to Lichfield and Derby) please say so to:

Patrick McLoughlin, Secretary of State for Transport                     patrick.mcloughlin@dft.gsi.gov.uk
​Claire Perry​,  Rail Minister claire.perry@dft.gsi.gov.uk  
Cllr Bob Sleigh, Chair of the W Mids Combined Authority      rsleigh@solihull.gov.uk
Cllr Darren Cooper, Vice Chair                                        darren_cooper@sandwell.gov.uk
James Aspinall, Managing Director, Centro                   jamesaspinall@centro.org.uk
Laura Shoaf, W Mids Integrated Transport Authority                     laurashoaf@wmita.org.uk
Stuart Everton, Black Country Director of Transport             stuart.everton@wolverhampton.gov.uk

Don't forget to remind them that they do have to write an unbeatable business case first!!

Don't forget to ask them to all go down to London and pay a visit to our Patrick and Claire for them to agree the transfer of funds from the two short sections for electric trams to be used instead for the full 21 Km for diesel trains.  They have enough money in the bank already (£207 m when they only need £72 m).

THANKS V MUCH!  They must be very fed up hearing from me.  One person can easily be ignored, as I am.  Put all 7 in the one e-mail, if you like.  Think up your own cheeky or attention grabbing subject field.


THE PLANNED BREAK UP OF THIS MAIN LINE RAILWAY IS PERMANENT AND A DISGRACE:


The UK’s only unused, major, North-South main line railway is to be sectioned up into:
from south to north, we have planned,​ in order,
  6 Km: daily, 25 waggon goods trains from Port Talbot to Round Oak, via Stourbridge Jct
  4 Km: Light Rail Metro trams (£310 m for 12 Km, inclu 4 Km of road running)
  2 Km: Very Light Rail shuttle trams, through Dudley Tunnel to Cinder Bank road
  4 Km: Light Rail Metro trams (£310 m for 12 Km, inclu 4 Km of road running)
  3 Km: Empty, private space of linear wilderness of shrubs, trees, Himalayan Balsam (an illegal plant)
  2 Km: of passenger trains - Bescot to Walsall
TOTAL: 21 Km   (approx distances)

This is 21 Km of a 74 Km main line railway between Stourbridge Jct and Derby through the increasingly densely populated and road/rail congested Black Country - the boroughs of Dudley, Sandwell and Walsall, with a population of a million.  Diesels and four rebuilt stations is £72 million (based on last year’s rural Beeching reinstatement in Scotland at £6 m per Km).
My reasons​ for wanting the trains back on every kilometre (​at a quarter of the price​ of trams on 8 Km, plus road running on 4 Km)​ instead of trams on 8 Km of the main line railway​:
  1. It is the UK's last remaining, easily reinstated north-south main line railway between Stourbridge and Derby.  Therefore, the most important unused rail line.
  2. The only one between train congested Grand Central Shopping Centre/basement station and the Hereford to Shrewsbury Line
  3. 74 Km between the two towns of Stourbridge and Derby.
  4. 21 Km between Stourbridge and Walsall that urgently needs to be reinstated first.
  5. This would be only the 3rd Beeching reversal in 50 years in the Black Country and Brum.
  6. Only 12 Km needs to have the track relaid and four stations rebuilt to give everyone 21 Km of passenger line, once more.
  7. COST: 12 Km x £6 m per Km = £72 million, including the stations (based on Beeching rural rail reversal in Scotland last year).
  8. It reduces chronic and worsening road and rail congestion in the Black Country and Brum.
  9. Quicker, simpler, cheaper and easier to achieve than 12 Km of road and rail running trams that the councillors and Centro officers have failed to achieve in 35 years of trying.
  10. If they were ever to succeed, it would destroy for an eternity and beyond, the possibility of passenger trains from London Paddington and the North being seen again in the Black Country!