I'm standing for Metro Mayor in the hope it might give a little more attention to passenger trains joining the freight trains on the freight only Stourbridge loop. It would meet the Dudley Tram at Cinder Bank roundabout where the Light Rail Metro would end and the Very Light Rail (VLR) test track already ends. Passengers would change onto the tram at Cinder Bank roundabout to continue their journey into Dudley town centre by tram. This was an official proposal last decade when the tocs were competing for the contract to run the service. BUT NOTHING WAS DONE ABOUT IT! This was negligence, yet again.
Monday, 11 December 2023
TRAINS back on the missing Stourbridge loop
Friday, 31 March 2023
WBHE Four Options
THE FOUR OPTIONS
- Terminate the trams in Dudley town centre with Phase 1 complete and cancel Phase 2. The best for climate.
- Do Phase 2 when you have all the money - to Cottage Street. The most expensive in terms of money and in worsening your declared climate emergency.
- Terminate Phase 2 at Level Street, halfway between the shops and the Waterfront. Saves building the second canal bridge and 400 m viaduct. Saves money and greenhouse gas emissions.
- Build Phase 2 so the trams stay on the railway line to connect with the national railway network at Stourbridge Jct and run the freight trains at night. Saves building both canal bridges and the viaduct. Saves money and greenhouse gas emissions.
Friday, 17 June 2022
to Labour cllrs, so far re the embankment
After forty years, it is still not too late to ask for the responsible, very much cheaper and sensible plan to send the Dudley trams down the railway line to Stourbridge Jct, with a tram stop at Brierley Hill. Please explain this to Qadar and your colleagues. And, you are the official Opposition, too! My council tax includes your expenses to oppose this very foolish and immoral and scandalous plan to destroy your premier Dudley No 1 Canal embankment, the only public open space and, by the rusty iron wall, the nature site at Merry Hill.
Thursday, 26 May 2022
Funny peculiar, rather than fun funny!
Why does everyone in Stourbridge want their principal mainline railway wasted in parts and destroyed in other parts?
Why does every person feel it's fine enough for the nearest thing that Merry Hill has to a wildlife site and a public open space to be completely obliterated by a 400 m, double track, railway viaduct? I have my own landscape enhancement scheme there to be covered over by the viaduct!
Why do even towpath walkers and canal boaters want their view of the distant hills and countryside spoilt by the concrete and steel viaduct from the high canal embankment?
Why is no one bothered, no one thinks there is anything eccentric or, weird and wonderful by this behaviour?!
Monday, 12 July 2021
Dudley borough's 7 railway lines lost BUT, THE 7th REMAINS PARTLY IN USE!!!
- Dudley to Wolverhampton - trading estates and homes built on it.
- Dudley to Brum - road built on 1 Kms.
- Dudley to Halesowen - more offices, shops and homes built.
- Moor Street to Brierley Hill to Baggeridge Country Park.
- Brierley Hill to Pensnett to Gornalwood - part of the 22 Kms Black Country Cycle-Walk Mudway.
- Gornalwood via Himley to NW Wolverhampton - part of the 22 Kms Black Country Cycle-Walk Mudway
- Two nibble sized chunks of the Derby to Devon via Dudley principal, mainline railway get "bus on rails" trams instead of the previous 100 years of local and regional trains.
Wednesday, 7 April 2021
Why Metro and Sprint make everything worse!
- Hundreds of millions of pounds of greenhouse gases are going to duplicate or replace buses and trains with Metro when what is needed are regular or normal commuter and regional trains on the principal, mainline railway from Stourbridge to Burton on Trent via Dudley, Walsall and Lichfield; and
- existing buses, trains and trams simply need to be made fareless to end the discrimination against the young and middle-aged who, alone don't have fareless travel; and,
- electric buses on roads direct are greener, rather than Metro "bus on rails" trams going on railway lines on roads.
- The railway lines on roads are made of steel that causes very large quantities of greenhouse gases to be emitted in the making of steel.
- With Sprint coming, Stourbridge remains isolated from Brum city centre because it terminates at Halesowen.
- With Metro coming, Stourbridge remains isolated from Dudley and Merry Hill because the tram stops at Cottage Street, Brierley Hill.
- With the tram terminating at Edgbaston village tram stop on Hagley road, bus passengers from Stourbridge and the west have an additional delay to their journey because you either have to change for the tram or, have a longer journey by bus, all round the Wrekin via the Arena and narrow roads choked with traffic and parked cars!
Saturday, 3 April 2021
Metro/Sprint simply duplicate and replace buses/trains to accelerate climate tragedy!
Hi David
In 3 lines, the UK's longest-running, most amusing scandal in world transport history!!
Monday, 20 April 2020
OUR VERY OWN LOCAL SCANDAL
- Why are you all and everyone, not up in arms at your own mainline railway sitting there for 50 years doing nothing?
- NEXT YEAR, now, the main works start in completely stopping it from it ever being the successful railway that it was for 100 years until 60 years ago.
- Why are you all, in Stourbridge, so laid back at the UK's last and your very own supposedly safeguarded, already built and available railway, still being converted to tram line and test track after nearly 40 years of Metro planning and work?
- All the effort going in to get Dudley MBC to declare a climate emergency (to make it officially hypocritical, by the way, because nothing will change) should be going into doing something positive and practical to lessen the emergency by stopping Metro, the test track and the extended cycle-walkway wrecking the 120 Kms railway.
- Why, when the middle half is missing all trains but is fully built and available, you good Stourbridge people, still are so relaxed and allow yourselves to be walked all over?
- You should all be scandalised that Dudley gets hundreds of million pounds spent on a rundown Dudley town shopping centre when Metro will make it even easier for Dudley town people to nip on the tram to Merry Hill!
- And Stourbridge is still left out on a limb, isolated, with the unused railway between Brierley Hill and Stourbridge Junction sitting there empty - apart from the goods trains.
Friday, 3 April 2020
First success in 2020. We'll get there by 2050 - in for the long haul!
Tuesday, 27 August 2019
I want the GP to be upstanding and outstanding
Wednesday, 31 July 2019
SOUND BITES!
GET TRAINS NOT TRAMS ON OUR SURVIVING RAILWAY NETWORK. More info from timweller1@gmail.comPUT PASSENGER TRAINS/STATIONS BACK ON OUR SECOND SUTTON RAILWAY LINE. More info from timweller1@gmail.com
PUT PASSENGER TRAINS/STATIONS BACK ON OUR SECOND STOURBRIDGE RAILWAY LINE. More info from timweller1@gmail.com
TRAMS ARE SO EXPENSIVE THEY ARE IMMORAL. ALL YOU NEED IS THE £1.5 BILLION to give us electric, fareless buses for everyone. More info from timweller1@gmail.comSCRAP SPRINT DIESEL BUSES NOT PLATINUMS. Use the over £300 million, instead, to give us fareless, electric buses for all. More info from timweller1@gmail.comVANITY, FLASH, PRESTIGIOUS, STATUS SYMBOL TRAMS are un-green, un-ecological and unethical. More info from timweller1@gmail.comBUSES NOT TRAMS MUST BE "THE FIRST CHOICE OF URBAN TRANSPORT", said George Monbiot. More info from timweller1@gmail.comOUR REGIONAL (SAD/HOPELESS/PATHETIC) POLITICIANS STILL PUT EVERYTHING BUT THE KITCHEN SINK ON OUR, NOW, MUCH DIMINISHED RAILWAY NETWORK! More info from timweller1@gmail.com
For a more sensible, cost effective and easier ways to reduce congestion and pollution. Fareless, electric buses for ALL; not for the few, like me! To free up road space for essential users. Paid for by abandoning Metro, diesel Sprint and CAZ. Workplace parking levy to reward parents who drop off and pick up their school children by two wheels or two legs or, who run the school walking bus. Payments at the end of term for fossil free, self-powered parents who sign their weekly claim form.THE ESSENCE OF WHY THE BLACK COUNTRY RAILWAY MUST BE FINISHED:GLORIOUS ENGLISH ECCENTRICITY: the UK's only mothballed, easily reinstated, ready made but they forgot the trains and stations, mainline railway. Our Great Brave Brexit Britain for you!WHICH IS MORE SENSIBLE THINKING?2 or 3 fast regional trains every hour and nine new stations to complete the 120 Kms between Worcester and Derby; OR: 6 to 10 "bus on rails" trams every hour and 17 tram stops over only 11 Kms to STOP the reinstatement of the railway "of national strategic significance."SMART POLITICIANS?£449 m plus cost overruns to build the Black Country Tramline over 6.7 Kms that destroys the Black Country Railway over 56 Kms. All 56 Kms can get commuter/regional trains back for less than £200 m (2015 figure). Or, stupid politicians?SMART RAILWAYS?Why CUT a 120 Kms principal, mainline railway through the congested West Midlands with a tramline in two halves, a railway test track and a trail of trees, Japanese knotweed and undergrowth, when absent trains on 56 Kms of track could have their trains and stations back, FOR LESS MONEY than using trams on only 6.7 Kms?Tim Weller Prospective Independent candidate for W Mids Metro Mayor 2020 to instil some urgency into how changes in transport, jobs and housing policy can reduce the impact of human climate breakdown and postpone Attenborough's "collapse of civilisations" and "extinction of much of the natural world" and "time is running out" warnings.
Tuesday, 12 June 2018
We have a winning, knock out argument!
Tuesday, 1 March 2016
Corrupt transport practices
- 78 Km of unused or goods only, double track rail lines alongside/near congested roads in the Black Country and Birmingham.
- Further 58 Km from Walsall to Derby via Lichfield is still not available for passenger trains.
- 2 important rail curves still not built - after 50 years.
- £750 m (all rail money?) for Grand Central Shopping Centre with the main line station tagged along as an afterthought and stuck in the basement.
- Now, plan for transport money going for subsidising M6 Toll to further reduce the amount of money for urban Beeching rail reversals in the Black Country and Brum.
- The W Midlands Combined Authority remains corruptly biased towards road schemes; secondly, towards super expensive tram extensions in Birmingham city centre; thirdly, £12 m for a second rapid transit mode to duplicate the first, trams. What little money is left over may then go to Brum rail schemes
- Beeching rail reversals continue to be sidelined in the Midlands.
- It is the UK's last remaining, easily reinstated north-south main line railway between Stourbridge and Derby. Therefore, the most important unused rail line.
- The only one between train congested Grand Central Shopping Centre/basement station and the Hereford to Shrewsbury Line
- 74 Km between the two towns of Stourbridge and Derby.
- 21 Km between Stourbridge and Walsall that urgently needs to be reinstated first.
- This would be only the 3rd Beeching reversal in 50 years in the Black Country and Brum.
- Only 12 Km needs to have the track relaid and four stations rebuilt to give everyone 21 Km of passenger line, once more.
- COST: 12 Km x £6 m per Km = £72 million, including the stations (based on Beeching rural rail reversal in Scotland last year).
- It reduces chronic and worsening road and rail congestion in the Black Country and Brum.
- Quicker, simpler, cheaper and easier to achieve than 12 Km of road and rail running trams that the councillors and Centro officers have failed to achieve in 35 years of trying.
- If they were ever to succeed, it would destroy for an eternity and beyond, the possibility of passenger trains from London Paddington and the North being seen again in the Black Country!